Prepared the bid cost estimate by means of computing the cost of mechanical equipment (pressure vessel, tank, column, heat exchanger, air cooled heat exchanger, compressor, and pump); calculating cost of bulk items; estimating the engineering, construction, and overhead cost; and summarizing all costs in Executive Price Sheet