PLANNING ENGINEER

Contract or Permanent United Arab Emirates (AS.AE) Salary package shall commensurate based on the years of experience and qualifications.

PLANNING ENGINEER, JGC, Nghi Son Refinery & Petrochemical Complex Project

START Date
END Date
Experience Hours (Planning & Scheduling)
1300
Experience Hours (Cost Management)
1300
Experience Hours (Forensic Analysis)
1300

Planning supports for JGC in Nghi Son Refinery & Petrochemical Complex Project

PLANNING ENGINEER, PV Shipyard, Vietsovpetro Tam Dao 05 Jackup Drilling Rig Project

START Date
END Date
Experience Hours (Planning & Scheduling)
950
Experience Hours (Cost Management)
950
Experience Hours (Forensic Analysis)
950

Planning supports for PVShipyard in Tam Dao 05 Jackup Drilling Rig Project

PLANNING ENGINEER, PTSC, Various offshore projects

START Date
END Date
Experience Hours (Planning & Scheduling)
8300
Experience Hours (Cost Management)
8300
Experience Hours (Forensic Analysis)
8300

Planning supports for PTSC in various offshore projects as followings:

Premier Oil Dua Subsea Field Development ProjectJun 2012 to Nov 2013 Bien Dong 1 Field Development ProjectJan 2012 to Jun 2012 KNOC Rong Doi Booster Compressor ProjectAug 2011 to Jul 2012 Lam Son JOC Thang Long & Dong Do Field Development ProjectJul 2011 to Feb 2012 Hoang Long JOC Te Giac Trang Field Development ProjectJul 2009 to Jun 2011

PLANNING ENGINEER, Central Engineering Consultancy Bureau (CECB), Highway, Building Project-20 Storied with Pile foundation, Southern Transport

START Date
END Date
  • Gather all data and information required for effective planning, scheduling, monitoring & controlling the execution of activities of the projects.
  • Prepare the work planning (in Primavera P6) Contractual Schedule for projects & get the approval.
  • Prepare the update schedules, monitor progress, anticipates – possible delays and suggests recovery plans if delays are encountered
  • Creating project plan, Adding activities, Scheduling projects, Prepare top and down estimation, Adding activity code, WBS codes, pro

Planning Engineer, TAG Engineering and Contracting, HO Based

START Date
END Date

·         Creating Project Execution schedules, Prepare Master Time Schedule.

·         Develop the Critical Path Network for Construction Schedules.

·         Update schedule in Primavera (P3 & P6).

·         Prepare the Manpower Histograms and S-Curves for the Construction Schedules.

PLANNING ENGINEER, Whessoe LGA Gas Technology, Dabhol LNG Project, Depa LNG Tankage Project, Kotri Barrage Rehabilitation Project, Hammerfest LNG Project

START Date
END Date
Experience Hours (Planning & Scheduling)
6500
Experience Hours (Cost Management)
500

During my time at Whessoe, I was employed at the head office on both live contracts and tenders, using Primavera P3, Suretrak & Microsoft Project 98 computer systems, with supporting documentation produced using various Microsoft packages. In this time I have worked on design only projects, EPC projects, tenders and FEED studies.

PLANNING ENGINEER, AMEC Capital Projects (Downstream Oil & Gas), BP CATS Valve Upgrade Project, Bathgate Gas Compressor Station New Works, Kings Lynn Gas Compressor Station Upgrade Project

START Date
END Date
Experience Hours (Planning & Scheduling)
6350
Experience Hours (Cost Management)
500

During my time at AMEC I worked at both the Darlington office and various sites, on live contracts, tenders and FEED studies, using both Primavera P3 and Suretrak computer systems, with supporting documentation produced using various Microsoft packages in-line with the company’s CTR system. In this time I have worked on design, construction, EPC projects and shutdowns.