PLANNING ENGINEER
PLANNING ENGINEER, PTSC, Phu My Ammonia Plant Revamp Project
Revamping for current ammonia plant from capacity of 1350 MTPD to 1620 MTPD.
PLANNING ENGINEER, M+W Group, P&G Gillette Factory
Build the first Gillette factory in Viet Nam for P&G
PLANNING ENGINEER, JGC, Nghi Son Refinery & Petrochemical Complex Project
Planning supports for JGC in Nghi Son Refinery & Petrochemical Complex Project
PLANNING ENGINEER, PV Shipyard, Vietsovpetro Tam Dao 05 Jackup Drilling Rig Project
Planning supports for PVShipyard in Tam Dao 05 Jackup Drilling Rig Project
PLANNING ENGINEER, PTSC, Various offshore projects
Planning supports for PTSC in various offshore projects as followings:
Premier Oil Dua Subsea Field Development ProjectJun 2012 to Nov 2013 Bien Dong 1 Field Development ProjectJan 2012 to Jun 2012 KNOC Rong Doi Booster Compressor ProjectAug 2011 to Jul 2012 Lam Son JOC Thang Long & Dong Do Field Development ProjectJul 2011 to Feb 2012 Hoang Long JOC Te Giac Trang Field Development ProjectJul 2009 to Jun 2011
PLANNING ENGINEER, Central Engineering Consultancy Bureau (CECB), Highway, Building Project-20 Storied with Pile foundation, Southern Transport
- Gather all data and information required for effective planning, scheduling, monitoring & controlling the execution of activities of the projects.
- Prepare the work planning (in Primavera P6) Contractual Schedule for projects & get the approval.
- Prepare the update schedules, monitor progress, anticipates – possible delays and suggests recovery plans if delays are encountered
- Creating project plan, Adding activities, Scheduling projects, Prepare top and down estimation, Adding activity code, WBS codes, pro
Planning Engineer, TAG Engineering and Contracting, HO Based
· Creating Project Execution schedules, Prepare Master Time Schedule.
· Develop the Critical Path Network for Construction Schedules.
· Update schedule in Primavera (P3 & P6).
· Prepare the Manpower Histograms and S-Curves for the Construction Schedules.
PLANNING ENGINEER, Whessoe LGA Gas Technology, Dabhol LNG Project, Depa LNG Tankage Project, Kotri Barrage Rehabilitation Project, Hammerfest LNG Project
During my time at Whessoe, I was employed at the head office on both live contracts and tenders, using Primavera P3, Suretrak & Microsoft Project 98 computer systems, with supporting documentation produced using various Microsoft packages. In this time I have worked on design only projects, EPC projects, tenders and FEED studies.
PLANNING ENGINEER, AMEC Capital Projects (Downstream Oil & Gas), BP CATS Valve Upgrade Project, Bathgate Gas Compressor Station New Works, Kings Lynn Gas Compressor Station Upgrade Project
During my time at AMEC I worked at both the Darlington office and various sites, on live contracts, tenders and FEED studies, using both Primavera P3 and Suretrak computer systems, with supporting documentation produced using various Microsoft packages in-line with the company’s CTR system. In this time I have worked on design, construction, EPC projects and shutdowns.
Pagination
- Previous page
- Page 33
- Next page