Water / Utilities

Project Planning Engineer, Modern Arab Construction Co.- Saudi Arabia, Tanajib Sea Water Expansion Project - Saudi Arabia

START Date
END Date

1- Preparation of Schedules 2- Updation of Scheduling 3- Preparation of Daily Manpower & Equipment Reports 4- Progress & Status Reports 5- Estimation of Resources 6- Cost Control Reports

SENIOR PROJECT CONTROL ENGINEER, CHINA HARBOUR ENGINEERING ARABIA CO. LTD, EPC OF MA'ADEN RAZ AL ZAWR PORT

START Date
END Date
  • Prepare project master schedule and project detailed schedules.
  • Monitoring and Controlling of the integrated schedule of all project activities including Civil, Mechanical and Electrical during the construction phase.
  • Prepare reports on Baseline vs Current Schedules plus analysis on forecast for weekly progress report to the top project management team.
  • Interface with Engineering, Construction and Commissioning activities to align activities according to plan
  • Preparation of float and critical path analysis
  • Issue Project Weekly/Monthly

Senior Planner, VATECH WABAG LTD, Water Treatment Plants

START Date

 

A) Planning and Project Monitoring:

Ø  Preparation and updation of Detailed Project plan at functional level with Primavera and MS Project.

Ø  Preparation of S-curve and planning package.

Ø  Monitoring and reporting of project progress and status of milestones to Management and Client.

Ø  Co - ordination and expediting of deliverables with project taskforce for timely delivery.

Site Agent, Subterra A division of Thames Water, Thames Water AMP3

START Date
END Date

Involvement from the early stage of the projects with designers and agreed the required feasibility study. Setting up and agreed the initial target cost. Prepare the master construction programme and the resources histograms. Prepare the health and safety plan, the method statement, the risk assessment, and then managing and supervising the site works. Monitor Progress, cost, quality and health and safety onsite.

Planning Manager, Mott MacDonald, AWS AMP5 Special Projects

START Date
END Date
Experience Hours (Planning & Scheduling)
5400
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
500

Project Description

Circa £250m 5 year programme of Anglain Water's most large and complex capital investment projects, including new & upgraded WTW, Upgraded WWTW, New potable mains, and shore repair of existing reservoirs. Projects were managed from concept design through to financial close and benefits realisation, managed under a modified NEC2 contract form.

 

Role & Responsibilities

Estimator, C & A Pumps, blast furnace, TATA STEEL

START Date

Became a project control engineering apprentice shortly after I left school. I am now in my 4th and final year of my apprenticeship; I was a project control engineer for Siemens VAI after I spent the first year of my apprenticeship at NETA, after a year and a half at Siemens i was made redundant and I carried on progressing within NETA, after 3 months I started at Topside but after 5 weeks I decided I couldnt fulfill my aims as an proj. engineer while being there so i left.