Forensic Delay Analyst, BALFOUR BEATTY, East London Line
Senior delay analyst reviewing the monthly programmes and producing a windows analysis for part of the project. Primavera based. Report writing.
Senior delay analyst reviewing the monthly programmes and producing a windows analysis for part of the project. Primavera based. Report writing.
Delay analyst on Railway Project.
Producing expert opinion delay report.
Tilos and ms project software.
All major civils works.
I attended site and provided assistance to SWT, checking and approving, quality and workmanship on the upgrade works to their train care depots.
One of the engineering wonders of the £5.2bn project CTRL was completed in 2003, the Thurrock Viaduct, the link between the Thames tunnel and Rainham Marshes. Thurrock Viaduct is one of the most spectacular achievements of the CTRL, a new viaduct crossing over the existing railway lines, over the Dartford Tunnel exit ramps and underneath the Queen Elizabeth the 2nd Bridge. This 1 km long viaduct was constructed over a year.
Richard started his career as a planner in 1978 at the Military Vehicle Establishment in Surrey, UK, helping to develop the next battle tank, and quickly learned how not to run a project. It overran cost and schedule so badly it was cancelled! It was at this time he learned Artemis (on system No.2 !) or Apollo as it was then called, which effectively guaranteed him employment for the next 20 years. MVEE used ICL PERT and barcharts were lengths of colored tape stuck to the page!