Oil / Gas / Power

Project Engineer, Thermax Babcock and Wilcox Limited, Arasmeta Captive Power Project

K
Kumar K 👤 Member for 19 years 6 months
START Date
END Date

Key Projects:

2 x 90 TPH Coal Fired AFBC Boilers for Arasmeta Captive Power Co. at Chattisgarh, India

 

  • Planned & Prepared schedules and worked on those time period to maintain commitments.
  • Executed assistance in procuring major systems and equipments.
  • Executed project under BAAN ERP System.
  • Prepared and reviewed PRIMAVERA schedules periodically.

Project Control Engineer, Praxair India Pvt ltd, Cryogenic Air Separation Plants

K
Kumar K 👤 Member for 19 years 6 months
START Date
END Date

Key Projects:

- 900 TPD Air Separation Unit for SAIL, Durgapur, India – Aug 2006 ~ Jun 2008­­

 

  • Responsible for Schedule and Cost Control.
  • Estimated and presented cost at various stages of projects.
  • Responsible for submission of various reports for monthly portfolio review of the project including Cashflow, S-curves, CPI/SPI curve, Contingency draw down curve, float analysis and Risk and Opportunities
  • Prepared and tracked schedule and cost in MS Project & Artemis.
  • Prepar

Niall Duncan

First Name
Niall
Last Name
Duncan
Professional Since
Oldest experience
Years Experience
1
Telephone Number
07876 478323

I am a hardworking individual who has a diverse range of interests.  My main sporting activities are cycling (mountain & road) and swimming (often considered triathlons but would need to learn to run) and I am a member of Dysynni Cycle Club.  Other interests include photography, reading and playing the classical guitar.  At the moment I am teaching myself to play the piano and Spanish. I enjoy the hands-on approach to everything I do and like to get involved and relish challenges whether they are physical or mental.  Throughout my life I have shown tha