Jan Van de Meent
See Linked-inn profile
Alliance Planner & Scheduler, Visser & Smit Bouw, Gas Storage Bergermeer and Boekelermeer Alkmaar
Planner of the civil works activities, Steelstructure, UG Piping and E&I installation (€60mln) for Visser & Smit Bouw at TAQA Gas Storage location Bergermeer and Boekelermeer.
Start from april 2013 - ........
Contractplanning, Base Line Schedules, Six Weeks Look Aheads.
Engineeringsplanning and Work Preparation planning.
Progress Reporting Engineering, Work Preparation, Base Line and Recovery plan.
Scheduler, EDL Anlagenbau Gesellschaft mbH, HERP
Setting up and progressing small to midsize refinery and petrochemical industry projects as member of 3 people scheduling team for a midsize process engineering contractor with Primavera P3E, P6 and Microsoft Project 2003/2007. Partial turnaround integration. Ovens redesign from heavy oil to natural gas, column change, asphaltene reduction plant, small projects down to MCC exchanges.
Scheduler, Aker Solutions - Aker Process Germany, Flare network upgrade, Raw Gas Dryer, W4 drain pipe net upgrade
Scheduling engineer with a few special duties: Convert a refinery's projects portfolio from MS Project to Primavera P6, including activity and other coding to owner corporation's standard. Establish solution to add resource usage forecast for those projects, maintenance and in a reduced form for turnarounds. Done while setting up and progressing 20...30 running projects in a 2 people team.
Later, scheduler for refinery engineering contractor's on-site taskforce, building and progressing schedules in P6 for 4...5 midsize projects, preparing turnaround integration.