Planner
Current Role
Current Role
Company overview:
ARYA SASOL Polymer Company is a joint venture company between the National Petrochemical Company of Iran and Sasol Polymers International, a South African petrochemical company. This complex is located in a 72 Hectare area within in "Pars special economic energy zone” on south of Iran, the total estimated investment amounts to 1,165 million Euros.
Key responsibilities:
Analyzing the contractors claim (considering my background on planning and control of those contractors)
Construction Engineering Specialist
Member of ABB Lummus Construction Management Team for the Saudi Aramco Hawtah Oil Field Development Project in Hawtah and Berri Gas Plant TIC/NGL Expansion project in Jubail, Saudi Arabia.
• Coordinates with construction subcontractors project control group in determining work status activities on weekly basis in regards to manpower, material & equipment site mobilization.
Project Controls Supervisor
Mohamed Turki Engineering Consultancy (MTEC), a joint venture of Mott-MacDonald – London, UK for Oil & Gas Maritime projects in providing general engineering services to various Saudi Aramco projects in their Western/Central Region Projects Division for the upgrading of their facilities.
• Primarily involved in the operations of proposals and project controls of engineering consultancy for various preliminary (FEED) and detailed design projects.
• Develop and set direction on budget preparation, resource planning and cost scheduling.
Sr. Project Support Specialist
Member of the ABB Lummus Global Project Management Team for the Exxon/Kemya Olefins Project in Jubail, Saudi Arabia. A lump-sum contract for engineering, procurement and construction (EPC) of 700,000 t/a Ethylene Plant.
• Monitor subcontract activities on project equipments schedules & mobility, status and costs. (In-Kingdom and Out-of-Kingdom procurement).
Dec. 2001 – Feb. 2002
Sr. Cost & Planning Engineer
Member of the Project Controls Department ( part time work on planning, scheduling & costing) in rendering engineering services for Saudi Aramco contracts.
Dec.2000 – Dec. 2001
Sr. Project Cost & Planning Engineer
Seconded to UNILUBE – Construction Site
March 2006 to May 2007
Sr. Planning Engineer (RLOC Project)
Member of the Technip France Construction Management Team for the construction of Ras Laffan Olefins Ethylene Cracker II Project in Qatar. Responsible in the execution and administration of the planning/scheduling and progress measurement system (progress monitoring) of the project.
• Provide review, study and evaluation of subcontractor’s construction plans & schedules in parallel to Technip’s target plan & schedule.
WAFA Development Project – Libia
Remborsable EPC Contract
Project Controll Manager for the Development of the wells in Libia desert and for the Gas plant on the Coast .
Current Role
Working as Contractor of Amerada Hess for Ujung Pangkah Development, Well Head Platform Fabrication - B, EPCC of topside and jacket of WHP-B.