KAMER Civil Engineer

Project:

     Tekel Museum & Art, Exhibition Center Construction Project / Uskudar /      Pasalimani

     restoring the 200 years old stone masonry government building, newly combined with      steel framed construction replaced with the old slabs and converting into      “Museum and

     Art gallery” with full electronic control, retrofitting the parts having structural problems.

MESTAS Planner

Project:

A Steel Framed Structure, Turn key Industrial building construction with a tight schedule. Total area approx 10.000 sqm. The steel members have been made up of welded steel plates (not ready to use profiles) finished in 6 months Gebze/GEPOS. Total Contract value $5 M, Turn Key project.



Responsibilities: (reporting to the company owner)

     Managing site activities,

     Monitoring procurement activities,

     Preparation of construction work schedule by critical path analysis,

design and construction planning engineer, Bureau Veritas, Esentai Park Project, Almaty Financial District Project, Marriott Hotel Project,

START Date
END Date

     Project:
Construction Project Management and Consultancy Services for Various projects in Kazakhstan.

Design / Construction - Planning Engineer, Bureau Veritas, Almaty Financial District Project - Turan Alem Phase

START Date
END Date

Project 1:
Almaty Financial District – Phase 2 – Turan Alem Bank Project (Almaty, Client: Capital Partners, Bank Turan Alem, Belgravia) (BOMA Gross area 160.000 sqm)

Responsibilities as Planning Engineer (Reporting to Construction Technical Manager)
•     Preparing of Design Schedules, Tender Schedules, Permit Schedules,
•     Reviewing the method statements for the scheduling,
•     Preparing of level 2 Construction Schedules,
•     Controlling and approval of Contracto