Coffey Construction Planner
Current Role
Main Projects:
• Al-Attar Tower (2B+G+M+73 – Shikh Zayed Road – 236 million Dhs)
• Al-Waleed Paradise Tower (3B+G+37 – Jumirah Lake Towers – 120 million Dhs)
• Al-Zaabi Hotel Apartments (3B+G+14 - Barsha – 87 million Dhs)
Planning Manager
Reporting to the Area Manager of Dubai and controlling a group of 5 planners, main accountabilities are:
- Initiating the reporting system for the group.
Main Projects:
• Jumeirah Heights Project – 4 Towers, 8 Buildings and Village center – 6 Billion Dhs.
• Heart of Doha Project (Doha city development) – Phase 1A – 9 Billion QAR.
Project Control Manager
Reporting to the Project Director, main accountabilities are:
- Review, upgrade, development and implementation of the project control system and integration with administrative and operational procedures of the Project.
Main Projects:
• Dubai Lagoon Project
Head of Planning Department
- Working as a Head of Planning Department with the project management consultant for the Lagoon Project. The main duties include:
- Preparation of pre & post contract documentation related to planning and scheduling.
- Creating master schedules, evaluation of tenders, clause 14 program,
- Tracking project executions.
Construction and installation of escalators and moving walkway for Algiers subway (23
escalators), Montreal subway (103 escalators) and Toronto Airport (3 escalators and 2
moving walkways.)
Supervised production by Chinese sub-contractors, reducing production cycle by half.
Identified installation and logistics sub-contractors for Algerian project.
Succeeded in a Moto-gear Claim for a previous contract.