Planning, Scheduling & Programming Discussion

Description

General planning comments and questions.

Container
No

Online Invoice Apps for any business?

A softwares for online invoicing.Iam in search of online software for my buisness.

I want an invoice App software for billing, for making online payments, converting them into excel sheets if required.Can anyone suggest such type of a software.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Primavera P6 Stand Alone Installation

S
SM H 👤 Member for 10 years 4 months

Hi

I previously installed P6 8.3.2 on my Windows-8 computer. Later on I installed Windows 10. The result was that the P6 stopped working asking for database configuration which I could not do. So I tried to uninstall P6 and its database (Oracle XE) and tried to reinstall P6 from scratch. However, after going through the installation procedure for few minutes, a message pops up announcing that the installtion has halted prematurely.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Progressing a Schedule Before Baselining

Hello,

After building the project schedule, but before reaching an agreed-to baseline with the client, is it ok to enter progress dates into activities that have taken place in the time between putting the schedule together and reaching the agreed-upon baseline with the client? Or is there a different standard method for doing this?

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Progressing a Schedule Before Baselining

Hello,

After building the project schedule, but before reaching an agreed-to baseline with the client, is it ok to enter progress dates into activities that have taken place in the time between putting the schedule together and reaching the agreed-upon baseline with the client? Or is there a different standard method for doing this?

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Baseline & Completion programme

Gents;

Could you please advise me a valid contractual phrase refering FIDIC to protect the skin of myself.

Sceneraio1 : Approved baseline MEP Programme prepared based on floorwide single access.

Scenerio2: Due to tremendous delay in civil works - 209 calendar days as of 9 February 2016 (total duration for MEP installation completion = 217 calendar days). No complete access was given to any floor as per approved baseline.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Field service management software for small business?

Field service management software for small business. Key features of Field Service Management Software are calender dlspatch which helps us to overview of all the employees who are dispatched on site. Invoice integration it saves time by converting a work order into an invoice. Quick responses sending workorder to the customers either accept or reject the order.

Let's discuss on this topic.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Non-repetitive calendar patterns

Hello everyone,

 

This is my first post on this forum so please forgive me for destroying forum rules.

 

My question is is there anyway to build a pattern in calendar? Like 2 days work 1 day holiday or nonworking day after 8 days of working. Maybe making a nonworking day per 2-3 weeks. I know i can do it manually but i need this for very long term projects. Sorry for my misarable english.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts