Progress Update - Restatus

Respected Engr's,

For an ongoing project, with duration completion of 4month, the Lead Consultant (A) was suddenly changed to another Consultancy (B). Now, the issues is during those 3 months, whatsoever the Engineering Submittals i.e. Prequalifications / Materials/Shop Drawings... approved by Consultant (A) is being resubmitted to Consultant (B) and new approval dates are being received.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

P6 Filtering on Activities View by Resource?

Good afternoon all,

I'm trying to pull together an engineering specfic layout with EV info and have hit a stumbling block with filtering.

What I am trying to do is only show activities with a certain set of resources assigned, plus filter to only show the hours for these resources. e.g. a management activity with 50 hrs for lead eng and 50 hrs for planner, filtered would only show the 50 hrs for lead eng. Is this filter possible?

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Issue with upgrade

J
Joe Jo 👤 Member for 9 years 8 months

Dear All,I encountered this issue while trying to upgrade from P6 to P8.2 on system 1 using the same software I installed successfully on system 2, even though I had purged the former of all files relating to primavera.[[wysiwyg_imageupload::]] Not sure if anyone has faced the same or could probably propose a likely workable solution. Thanks.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

how to start a project planning

Hello friends,

I want to know about the detailed steps of project planning especially the beginning like

1.what we exactly do after the project is awarded.

2.On what basis we create WBS and activity ,

3.How we set duration of activity

4.for what kind of actitivity we use level of effort activity type.

5.How do we allocated budget across activity ,

6.how do we find out the productivity, 

7.  how to find out KPI

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Exporting Budgeted Curves from P6

Hi All, I hope someone would be able to help me out ASAP!! :)

 

I fished building this Schedule and now that its time to export the curves into excel i'm having difficulties.

 

Keep in mind that aproximately 50% of this plan is critical and the complete plan is purely logic driven. Analising the logic one would say that the logic is sound and there aren't any problems. Also the Budgeted curve and early finish curve are literally identical. No actuals...

 

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Starting out as a level 3 planner

Hi AllI have recently moved into a planning position. The role is a level 3 planner  And I would be grateful on some advice. As there is so much information out there.  I have the Paul Harris Primavera book. And where possible, spend some time each day Reading and reviewingIn addition recently passed my APMP  I have 4 projects to review currently.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Schedule Development Process

Y
Y Malik 👤 Member for 15 years 6 months

Hello everyone,

I am tasked to develop a document that explains the methodology to develop a detailed EPCM schedule.

I was wondering if anyone has such document and willing to share it with me at my below e mail address.

[email protected]

Appreciate your help in advance.

 

Malik

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Show Longest Path with Positive Float

Hello,

In a schedule where all task-dependent activities have positive float, is there a way to show the longest path with that positive float?

 

For instance, a project is awarded 01-Jan-17 and the contract completes 01-Jan-18.

The 'Contract Complete' schedule activity in the schedule needs to show the fact it completes on 01-Jan-18.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts