How to Build a level 5 schedule using PowerPivot

here is a free template using Excel 2013, no VBA is required, you need Powerquery Installed

 

the template use a schedule forecast data ( P6, P3, Ms Project etc) and the MTO data to generate any Gantt chart you may think of

 

https://datamonkeysite.wordpress.com/2016/11/11/how-to-build-a-level-5-…

 

want, schedule by tag, and area fine, construction by subsystem etc

 

comments are welcome

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Scope Change- additional project to existing project

Dear all,

There is additional two new building project that was added to 6 existing building projects. the 6 building are almost complete while the two new ones are still in the structural stage.

The two new building contract were signed as an annexture to the main contract beacuse the value exceeds 20% of the original scope amount.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

New PM Tool - Please help us

Hello everyone,

my name is Rebekka and I am currently working on a project for Project Managers. We are in the design phase and some input from people, who are professionals, would be highly appreciated.

If you can spare some time, please check out our small survey:

https://de.surveymonkey.com/r/7S2XN8N

 

Thank you very much.

 

Kind Regards

Rebekka

 

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Progress Variance Vs Finish Date

F
Fahad Ali 👤 Member for 9 years 7 months

Hi

My percent complete type is duration. I had a baseline that had actual dates and now program mitigated and revised. So my previously updated program is now a baseline for current update. Problem that I am facing here is, my activity progress variance is not matching with Finish date.

 

For example: actual progress is 80% and planned is 90%. remaining baseline duartion was 35 and remaining duration now is 11 which is not matching my actual progress of 80%. As per my actual percentage, remaining duration should be 7(20%*35). It is P6 version 8.2. Please advice.

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

Fuel Storage Tank

Hello All,

I would like to know the Construction activities in Tank Construction " Fuel Storage Tank - Fixed Cone" . Its a 10000 BPD Tank.

I have listed dow the activities in the sequence of Construction but please let me know if anymore details need to be added and monitored

Tank Civil Foundation

  • Tank Foundation Excavation and compaction
  • Blinding Concrete
  • Form and Steel Work    
  • Concrete Pouring
  • Soil Fill and Compaction

Tank Bottom

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts

External Links in p6 Schedule need removing - inter project links

So i have opened my schedule today in p6 and relised someone else has copy parts of my project into their's as they needed the same type of activities in there schedule.

 

However when they have copied and pasted the WBS it they seem to have had the Only between copied activiies un checked (in the copy activity options) and thus i now have hundreds of inter project links as it is maintaining those links from my schedule.

 

How can i quickly removed these as there are hundreds

Forum Sponsor

Top Posters

JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts