manhours waste storn water pipe provision

Hello everyone,

Anyone has manhour table regards to infrastucture works? Like waste, storm water piping based on diametre, or manholes production and provision etc.??

I checked out planningplanet ;however, i couldn't come up with a solution. I need detailed capability limits otherwords manhours for provision of waste, storm water pipe. 

Best of luck,

Errol 

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Helpppp Guysss Project planning, Project progress, Earned Value Reportsssssssssss

B
BRAVE G 👤 Member for 15 years 7 months

HEllo Guys AS i'm still a baby in planning can anyone send me sample of the above named reports....... Project planning, project progress and Earned value reports.  

 

 

plsssssssssssssssssssssssssss ASAP MY EMAIL: [email protected]

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Scheduling software recommendations

D
Don Myntti 👤 Member for 15 years 5 months

Hi, first post.

 

I am looking for recommendations for scheduling software.  We currently use Primavera P3 but it is time for an upgrade and IT has reservations with Oracle.  I am the senior project scheduler and maintain schedules for up to 15 construction projects at a time.  Our typical schedule is about 200 activities and has a duration of about 3 months.  The original schedule is built in the estimating phase and then a detailed schedule is created with our field superintendant prior to moving in to a job.  The schedules

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

WBS for EPC project (engineering-procurement-contstruction)

Hello friends, I have been asked to develop an EPC work-breakdown. I just completed the construction wbs but i have no ideas about E and P, I am too new in this field. Would you please suggest me an example or an already made structure so I can start working on it and adequate it to my needs?

 

Thank you very much

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Deploying Earned Value to a programme with NO Resource cost (all projects delivered by contractors)

R
Ronny Don 👤 Member for 16 years 6 months

I would like any views or experiences of deploying Earned Value or what has been deployed to fill the EVM requirement on programmes where all projects are tendered as turnkey (goods & service) to single suppliers (external contractors).

I will submit complete analysis of findings back on to the site.

Thanks all in advance

Ronny

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Aiport Hange and repair facility

R
Rajeev P.U. 👤 Member for 18 years 7 months

Hello Planners,

Our company has been awarded a new job of the Airport Maintenance, Repair and Overhaul facility. As this is my first job of this kind I look forward to have some guidance that may be helpful to develop the master schedule for the Client

This is a Design Build Contract.

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts

Forum Sponsor

Top Posters

Neil Atkinson
5 posts
Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts