AB Timo 👤 Member for 15 years

Hi Gentlemen,

I needed opinion of professional planners.

The situation is that i am getting a couple of activities that are placed in my schedule so that it is not possible to assign them any successor.As a result the end is open end.Is it Right to assign them a finish milestone as a phase finish milestone and continue with the schedule????????????

 

Regards

Engr.Faiz

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Need help in sewage system planning

Dear All,

Our client wants to compete for the construction of a complete sewage system, which includes the construction of sewage pipes in more than 200 streets.

During the construction streets will be closed, and some of them will be closed at the same time. It is a requirement (and we should prove it now in the tender phase) that despite of the cut offs (blockades) of the streets all the adresses will be accessible from everywhere.

At the same time - as deadline is tight -  we want to start the construction at as many as possible streets.

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Updating Resourcess

Hi All,

.HOW TO UPDATE PROJECT WITH RESOURCESS , which column i need to update schedule on Status tab in primavera  "Duration" or "Status" or "Labour Units" ? 

 If i have to Enter my actual dates on "status " column what should be my % complete type for With Resource project and With out resource project

 

 Antcipating inputs [email protected] 

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

P6 Weekly Updating and Archiving

I am currently working in one project with P6. What is the best method to archive weekly updated schedules?

When I used SureTrak it was as simple as saving the file with a different name and accessing the file from my desktop folder.

Any suggestions would be great?

Thanks

Chris

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

UPDATING A SCHEDULE

A
AB Timo 👤 Member for 15 years

HI Gentlemen,

I have been updating the progress in primavers version 6, by using Duration as % complete type.But i have also heard that one should use Physical as % complete type...I then used physical but the results were the same.Can someone tell me that what is the difference in using these two?????

 

Regards,

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

UPDATING THE PROGRESS

A
AB Timo 👤 Member for 15 years

HI Gentlemen,

I have been updating the progress in primavers  version 6, by using Duration as % complete type.But i have also heard that one should use Physical as % complete type...I then used physical but the results were the same.Can someone tell me that what is the difference in using these two?????

 

Regards,

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

What's the opposite of "Slippage"?

I am developing a new schedule template which visualizes tasks which start/finish after the deadline, and task which start/finish earlier than planned.

Now I am looking for an appropriate terminology:

- the first would be called a "slipped task", or "task slippage"

- the second? An "advanced task", or "task advance"?

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Establishing a Critical Path

A
AB Timo 👤 Member for 15 years

Hi,

People working in primavera must know that when you schedule your programe of work after adding relationships,it makes its own critical path based on the longest path having 0 float...

Now I have a schedule with a critical path and i want to change my critical path.I know you can change it if you know how to play with the activity relationships ,but is there any other method that is time saving and shorter then the above mentioned one?????????????????????

Regards

Engr.Faiz

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Holding an Activity

A
AB Timo 👤 Member for 15 years

Hi,

I am Faiz.have been working for last two years as Planning Engineer Using Primavera V6.

I needed to ask that when I want show a activity on hold how to show it precisely.I tell you my procedure and you tell me that wither it is right or not??

I have an activity named "Mobilization"

The Planned Start is was 11th june 2011..and it started on the planned date i.e, 11th june 2011,

But it was holded due to some reason on 15th june and will remain holded till 18th june.

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts