work schedule for deep basement

i am currently working on a deep basement project for my university coursework and was wondering if someone could help me with a case study of deep basement construction shedule[ microsoft project]. dosent matter what type of building it is i just want to use it for a reference.

i am mainly intrested in the work packages from start to finish as long as the building has a deep basement.

i hope this makes sence and i look forward to your replies.

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

how to pull out critical path from a large network?

M
Matt Ir 👤 Member for 14 years 7 months

Hey Guys,

Just went to interview and the guy asked me a confusing question : tell me how you can pull out Critical path in a network?

i already know about the backward and forward pass, total float and longest path, but i dont know what was in his mind exactly.

 

Can anyone tell me how? perhaps by P6 please ?

THanks

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Railway Electrification Works

B
BRAVE G 👤 Member for 15 years 7 months

Please Anyone with railway electrifcation works should please send me WBS on any software. I would import onto my P6 V7.

 

Please anyone with anything rail related shd contact me. i am willing to pay consutancy fee. 

 

 

 

Thanks My Planning Family.....

 

 

Geoff

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Steam Genrator /Boiler Mechanical Completion and comissioning

I have a question regarding the Boiler Mechanical Completion (MC) and Commissioning /Start-UP.

Here is the situation.  Steam Genrator/Boiler has associated units such as Utility Water, Potable water and tanks, Fire Water, Deminerlizeed Water and condensate, Boiler Feed Watrer (BFW) and Deaerator, Limestone and ash handling unit, Compressed Air, etc.

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Fs Links and Critical Path.

A
AB Timo 👤 Member for 15 years

Hi all Planners,

The Focus of discussion shall be on the The Topic

 " Always use  Fs Relationship and No Lag"

I was a part of this discussion another forum and was getting different responses,some are as under,

1- Always Use Fs Relationship With no Lag.

2-Always use positive lag with forward pas only and try not to use -ve lag.FS relationship is not necessary (majority oppinion)

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Hard Linked Activities

D
D Artagnan 👤 Member for 17 years 9 months

Hi Planners,

I just moved to a an existing project (consultant) and the program has already been approved. Actually, 35% of the time has already elapsed. My concerns are the following:

1) The activities in the project were hard linked causing the schedule to have a huge negative floats due to the delay of an approval.

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts

Forum Sponsor

Top Posters

Trian Asmoro
1 posts
Soheil Barekat
4 posts
Erkan Polater
9 posts
Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts