Production rate

S
Sunil Babu 👤 Member for 15 years 7 months

Hi friends,

Just a few things for your discussion.

Few production rates are given below.

1.Backfilling   by machine m3.........0.22

2. backfill by labour (with compaction)  LM.......4

3. bulk excavation 45m haul  m3.........0.09

4.Trench excavation by machine LM....1.67

IS IT BASED ON 8HRS OF WORK..?

any body pls explain.

Regards

Sunil.

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts

sewerage and drainage project

S
Sunil Babu 👤 Member for 15 years 7 months

Hi friends,

Any body please share yuor ideas regarding a sewerage and drainage project.

How will be critical path in that type of project.It includes Pumping stn work,

manholes , main line , lateral line and house connection works road crossing and

piling works also included.

Regards,

Sunil.

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts

Please comment on my approach for overtime planning in MS Project

E
Evgeny Z. 👤 Member for 18 years 5 months

 

Dear all,

I would like you to comment on my approach for overtime planning.

Say I plan a project, and I know that to do certain activity I would need 2 engineers for 2 weeks.

The type of business we are in, is that we work in weeks blocks, and I know in advance how long we will be working and how many people will be assigned to do a job. (e.g. to make a baby I would assign 1 woman for 9 months)

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts

Best way to plan travel costs in MS Project

E
Evgeny Z. 👤 Member for 18 years 5 months

 

Dear all,

I would like everybody to comment on my approach for planning travel costs of the project. May be you can suggest something better.

If say I have a project, which would last for a year (a critical path). I know that this project would occupy Project Manager (PM) for pretty much 100%. I also know, that this project manager would travel to the customer in average every 4rth week (so, in average 25% of his working time). I also know his travel expenses for a week (say 2000 USD). I also assume, that PM would book 40h on a project per week.

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts

Level 1: How Much Details Should it Contain

Dear Planning/Schedulers of the World:

 

I am wondering to myself sitting in a foreign country next to foriegn engineers (Today been the Day of the Engineer), how much details should a Contractual Level One Schedule should it contain. 

 

Please advise me, I am attaching two version of a Level One Schedule I have created. 

 

Version One Was rejected:

[[wysiwyg_imageupload::]]

 

Version two Was Approved:

 

[[wysiwyg_imageupload::]]

 

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts

P6 Unable to configure SQL Database after Computer Crash

Hi

My hard drive crashed & I am having a hard time setting up my database again. It was backed up & successfully restored, however, when I open P6 I have to set up the database. I then try logging in with - 

Host Name - PCNAME\PRIMAVERA

Database name - pmdb$primavera

Username - pubuser

Password - pubuser

I have also tried with username & password 'pivuser' without success.

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts

Forum Sponsor

Top Posters

Luis Jr Ngade
6 posts
Ben Welsher
1 posts
Rohan Dashputre
0 posts
AMECHI ANAKWENZE
2 posts
Jayaprakash Sekar
1 posts
arash.karmand
0 posts
James Williams
74 posts
Vahidazimi01
0 posts
David Smith
4 posts
Peter Holroyd
51 posts