Planning, Scheduling & Programming Discussion

Description

General planning comments and questions.

Container
No

Short article on the value breakdown structure (VBS) at Jean-Yves Moine's 3D-WBS site

You can find it here on Jean-Yves' very interesting site.

A value breakdown structure is, along with critical path drag, drag cost, true cost, and some other metrics, a feature of the Total Project Control methodlogy. For those who are not familiar with the features and benefits of a VBS, I think this article explains the concept quite thoroughly.

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Multiple choice network scheduling and critical path drag quiz

Hi, all.

I have tried to post some of the quizzes from my graduate classes on this forum before. However, there were two problems:

I couldn't figure out how to post a network diagram;

I was making them multiple choice so people weren't trying.

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

activity critical by SS

A
Ahmet Tuter 👤 Member for 13 years 4 months

in my schedule there is an activity B which has a successor of G with SS. B and G is critical but another activity C which follows B by FS starts one day after B is finished because of another relation. So B start can not move and this makes b critical. ButB finish date can be longer by 1 day and this will not delay the project. All types of slack shows as 0 for B. But as I said you can extend B duration by 1 day without delay. Why is this the case?

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Integrating design and manufacturing plans

J
Jo Day 👤 Member for 13 years 11 months

Hi all

I wonder if you can help me?  I have recently started a new project, which is a bespoke design.  There are many prototypes to be designed and manufactured.  These prototypes will tested against eachother and further design will be required until they are satisfied they have the right design to build the final product.

I have obtained a task list/drawing output list from the design team for the first prototype.  I also have a build schedule from the manufacturers.

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Submission Activities

Hello, 

I'm working in a project that has contractual certain dates for submissions of documents. How should I link these activities? Especially, if I figure that I can send these documents earlier than the contract date according to program but I dont want client to see these dates  earlier in the program.

Also there is one more issue, some documents are predessors for others and contratual submission dates for these activities are same.

For Example, 

Act A is predessor for Activity B and contractual submission dates are same.

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

The Practical Use of Site Progress Mobile App by Asta

J
Jon Compton 👤 Member for 14 years 1 month

I’m hoping that someone can help with the following….

Has anyone managed to use the Site Progress Mobile App from Asta successfully?

Can the data be backed up to local server instead of using an iCloud?

Is there other methods used that can have a copy of the programme that can be progressed out on site via tablet/iPad..?

 

Jon Compton 

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts

Forum Sponsor

Top Posters

David Smith
4 posts
Peter Holroyd
51 posts
fridau
0 posts
Rahmat Hidayat
32 posts
pinoyplanner
1 posts
James Williams
74 posts
Saqib Ullah
1 posts
Luyanda Ndlumbini
2 posts
Jeff Waldrop
6 posts
Robert Roy
1 posts