Updating the baseline

G
Gowhar Mir 👤 Member for 8 years 1 month

Hi there! I wanted to know if there is a process to update the baseline or the current program by making changes in either of them. For example, if I have made changes in my baseline few months after the commencement of the project, is there a way from which I can copy this update into the current program or vice versa? Say I needed to add some activities to the project, change duration of few activities. Is there any way with which I can incorporate only these changes in the program?

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts

Stop activity splitting over a non-working period

A
Al MacLeod 👤 Member for 19 years 4 months

Hi,

I have an activity 4hrs in duration that needs to be completed within one working period (08hrs - 17hrs). Currently I have it on a calendar with non-working time (17hrs - 08hrs). If the activity starts too late (say at 15hrs on day one) it is split over the non-working period and completed in the second day at 10hrs. How do I stop the activity starting on the first day and moving it so that it starts and finishes (08hrs to 12hrs) on the second day.

Thanks in advance for your help

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts

Progressing multiple activities

What is the easiest way to progress a large number of activities in one go ?

(for example progressing all erect scaffolding work to 100% in the pre-shutdown phase of a turnaround)

I am familiar how it works to progress one activity, but manually clicking through 50 scaffolding activities is preferrably not the way to go.

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts

P6 with Arabic script

G
Gün Göksu 👤 Member for 21 years 2 months

Hi everyone,

I have received a standard P6 v8.2 P6 XER file (encoded in ANSI).

There are some arabic writting wisible in the encoding is changed to Windows-1256.

Importing this to P6 v15.2 gives griberish. does not correct when font is changed to arabic.

 

There was a way to get these arabic scripts to be visible properly. Anyone remember how?

 

Thanks.

Gün Göksu

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts

Full of Constraints

As a bigenner planner, I have made a plan for a client as two projects, the start and finish dates for one of them are the actuals. whereas the start and finish dates of the other one are the planned ones, then I maintained the latter as a baseline to the first one, the client did not accept it and asked to modify that, he has also mentioned that the project is full of constaints. Are there any other ways to follow?

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts

Need a favor from any kind professional

A
adab azeez 👤 Member for 9 years 11 months

Hi.
Greetings to everyone.
I am planning to switch to Project ( oil and gas construction). Currently I am in oil and gas maintenance.

Honestly, I will be really grateful if anyone shares his project xer file to understand the project schedule.

Waiting for any positive answer.
My email is adabazeez at yahoo .com.

Thanks in Advance, for your gendrousity.

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts

RESOURCE LOADING FROM EXCEL TO PRIMAVERA (P6v7)

Gentlemen,

 

I am very new to this concept. I can create schedule and can create resources and assign in P6 (individual activites) , but I heard that we can import Resources from Excel to Primavera and also Vice versa.

Kindly tell me how to upload the resources from excel to P6 v7  and also reverse ?

Please email if any related documents.

thank you for sharing your knowledge.

 

Prasad

([email protected])

Forum Sponsor

Top Posters

Jeff Waldrop
6 posts
Robert Roy
1 posts
Tony Wright
4 posts
Arshman
0 posts
Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts