P6 with Arabic script

G
Gün Göksu 👤 Member for 21 years 2 months

Hi everyone,

I have received a standard P6 v8.2 P6 XER file (encoded in ANSI).

There are some arabic writting wisible in the encoding is changed to Windows-1256.

Importing this to P6 v15.2 gives griberish. does not correct when font is changed to arabic.

 

There was a way to get these arabic scripts to be visible properly. Anyone remember how?

 

Thanks.

Gün Göksu