Oracle Primavera - PM6

Description

Here's a place to discuss some Primavera Enterprise questions

Container
No

Primavera P6 Create Activity Codes

E
erdem sahin 👤 Member for 4 years 2 months

Hello Guys, i have more than 300 zones, districts and sublines, in Primavera yes i can write manually all lines to activity code menu, but it takes much time, is there a any easy way to create activit codes then import Primavera, i am not asking assigning codes to activity i can do that one, please help me , thanks and regards.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

At Completion Units Calculation

Hi Planners,

 

I want to make p6 calculate at completion units in accordance with actual units and % complete of activity.

For example i have an activity with 500 manhour reosource loaded and i choosed %Complete type as physical complete.

I started the activity and lets say the activity physical % complete is %50. i entered 100 manhour as actual unit.

So im expecting that the at completion unit should be 200 manhour, because i've spent 100 manhour to finish half of the work. But i couldnt figure how to make p6 work like this. 

Kind regards

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Database Malformed error

Morning folks,

I have a Primavera P6 v21.12 standalone SQL Lite database which I was working on yesterday, however this morning I have gone to open P6 and it is giving me a "database disk image is malformed"

Thankfully I did create an xer backup last Friday, so still have the main project available which I have imported to a new DB, however I'd really like to be able to access the corrupt DB.

Anyone know of a way this can be repaired?

Thanks,

Phil B.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Overall % Complete

Hi All,

Would like to know if we can show overlla % compelete in PRimavera updated schedule.

I have been progress measuring using excel in which some activities progress is measured by

  • Manhours
  • Cost

But the OVerall weightage is claulated based on the assigned weighate as per Contract for example

Engineering - 15%

Procurement - 40%

Construction - 35%

Commissioning - 10%

 

So can we show this in PRimavera 6 updated schedule ?

Regards

Jithin

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Metrics - DCMA, JCI, Tender, NEC - which most common, best for city, state general projects?

J
John Reeves 👤 Member for 13 years 1 month

Just wondering, it is not like any are required.  I know nothing about them, except I would not want to have to have all green circles (acceptable) if I was making a schedule, decent reference but just that.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Metrics - DCMA, JCI, Tender, NEC - which most common, best for city, state general projects?

J
John Reeves 👤 Member for 13 years 1 month

Just wondering, it is not like any are required.  I know nothing about them, except I would not want to have to have all green circles (acceptable) if I was making a schedule, decent reference but just that.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Difference in Progress - Stand alone and Server

Morning All,

We are currently experiencing a difference between the P6 Server and Stand alone reported Progress on both the Planned and Actaul percentages complete. We have checked that all the Admin Settings and Settings under user preferances are the same.

Has anybody experienced this issue before or know of a solution to get the progress aligned on both the server and stand alone. In terms of the dates we do not have any issues as the Overall and detail task start and finish dates are the same.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts