The F9 is Canceled when i close the project

Hi everyone, 

I have a probleme with a project in P6, the dates ( delta of 1 minute but the date change to the day after )  of about 30 activities (30/1600) changes when i close and re open the project. I think that the problem comes from the excel that we import in order to change the ressources. So when i remove the ressources its all ok but, so i try to add the ressources back... same problem

i tried to add another activities with the same sittings it remains the same. 

thanks a lot for ur help!

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts

Schedule Performance Index in P6

I'm in the process of rebaselining my projects and our management decided to implement SPI with the new baseline. As the revised baseline should show SPI of 1.00 (earned = planned or whatever earned is planned), I made the SPI equal to 1.00 by using the  percent complete calculated from the Schedule percent complete column in the physical percent complete column (This makes my earned = planned and therefore SPI = 1.00).

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts

Imported XER is resetting progress

Hi,

Im having a weird issue whereby I am exporting an XER of a project that has been progressed, changing it to a .txt file then opening it in Excel to "bulk add" activity codes. I then save the file, change it back to an xer and import the project.

Everything works perfectly APART from the schedule now has no progress. Logic remains the same, new activity codes are there - everything is good except all progress has reset back to 2010!

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts

Excel spread sheet to read XER files

R
Ron Beechey 👤 Member for 10 years 2 months

Looking for excel spread sheets or the likes to read xer files and produce curves and any other helpful information.   I have one "01-XER-READER" which I found very good but wondered if there was a actual curve that could be added.  There may be also an update which I have not been able to find.   Always good to not reinvent the wheel if someone has already worked on something.

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts

Event PPUSP-2728-E

Hi,

I am getting an event interception PPUSP-2728-E. The details of the error is as follows.

PasteProjectUsingSP returned error -1Error inserting into PROJCOSTORA-12952: The request exceeds the maximum allowed database size of 4 GBUnable to copy tasks in NEW_WBSError creating new wbs

How to resolve it?

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts

Primavera P6, 16.1: Progress line on collapsed group activities

J
Jon Gusto 👤 Member for 6 years 8 months

Hi,

 

Is there any way to make progress lines track the grouping of collappsed activities. I have late start activities and it tracks the individual activities and milestones but if I collapse them in group lets say grouped in Level 1, the progress line doesnt track the delays.

 

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts

Forum Sponsor

Top Posters

Stan Remiszewski
1 posts
GeoVe
0 posts
JAGAN REDDY MUSUKU
0 posts
Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts