Oracle Primavera - PM6

Description

Here's a place to discuss some Primavera Enterprise questions

Container
No

Sort by Project in Activity View

A
Al MacLeod 👤 Member for 19 years 4 months

Hi,

I have several projects that i open at the same time. I want to sort the projects into a specific order. They are shown in the EPS in the order i want. When i open them all and go the activity view they are in a different order. How can i specify a sort order?

Thank you

Al

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

After Import Programme Showing Different Overall Progress Figures

The Contractor submitted its XER file for its updated programme using P6 Ver 7. I imported the file using P6 Ver 18 and its showed that the Overall progress percentage is not the same. Contractor's update is showing 95%  and my import is showing 91%. I investigated the updated programme and found that some of the activities under Engineering and Mobilization WBS were having a % Complete Type of "UNITS" and it appeared that the progress % on these activites having this setting do not roll up to the WBS summary and similarly to the Overall progress percentage.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

After Import Programme Showing Different Overall Progress Figures

The Contractor submitted its XER file for its updated programme using P6 Ver 7. I imported the file using P6 Ver 18 and its showed that the Overall progress percentage is not the same. Contractor's update is showing 95%  and my import is showing 91%. I investigated the updated programme and found that some of the activities under Engineering and Mobilization WBS were having a % Complete Type of "UNITS" and it appeared that the progress % on these activites having this setting do not roll up to the WBS summary and similarly to the Overall progress percentage.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Tracking schedule changes

We have a database with 8 users, all with the same level of access. One of the users claims that "someone" has been in and changed one of his schedules.

I know I can see who has the schedule currently open, but is there any way to track who has opened the schedule in the last say 24hrs or so?

Thanks in advance.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

One Day Filter

Hello All!

More help needed......

I'm trying to create a filter that I can use daily to do a vertical slice of just the activities that are happening on a specific day. 

Here's what I have so far but I'm not sure what I'm missing:

Activity Status not equal to Completed

Start equals Dec 1

Finish is great than or equal to Dec 1 

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

P6 Assign Resource Dialogue Replace Button Greyed Out

Hello,

I've used the Replace Resource function in the Assign Resource dialogue several times but today the Replace button is greyed out and I cannot 'swap' resources.

Below grab shows assigned resource and new resource, Replace button is greyed out.

Any ideas?

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

I am making a case for "non-related sequential logic"not physical related but the logic is not everything can get done at once.

J
John Reeves 👤 Member for 13 years 1 month

I am making a case for "sequential logic" - not physical related but the logic is not everything can get done at once.  Is this a know practice - or am I now making it one.  Your thoughts - I have commonly done this but not named it as such.  I really dislike a schedule that has 50 submittals all starting the same day with tons of float, I like to stagger the start, but these crazy restrictive specs means that I have to tie them logically when "logically" there is no tie but sequentially there is.  Did I just create the term "non related sequential logic"?

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts