No

Can I find out who moved my EPS node?

Hi

We work on Primavera on citrix environment in my company.

Recently I was surprised that one of my second level node I created under a Specific parent EPS was not available anymore. Upon searching thoroughly, I found out that this was moved to another Parent EPS. I moved it back to my EPS again.

But I want to know who moved it. Is there anny way i can see a Log or a Historical view on this ?

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

How do tie together the P6 Schedule, Submittal Schedule Log, & the SOV? they have redundant info - a code?

J
John Reeves 👤 Member for 13 years 1 month

How do tie together the P6 Schedule, Submittal Schedule Log, & the SOV?  they have redundant info - a code?  A code could tie them together but how?  Sometimes multiple schedule items belong to only one SOV and vice versa - you could put the sched id in the sov and the sov number in the schedule but couldn't there be one similar code?  I think InEight might do something like this but I am not sure.

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Columnas de Primavera P6 equivalentes a las de MS Project

Cordial saludo.

Soy un usuario mas asiduo de MS Project que de Primavera P6, por ello acudo a todos aquellos mas conocedores de P6 para la siguiente consulta:

[[wysiwyg_imageupload:7944:]]

MS PROJECT COLUMNA EDT , MS PROJECT COLUMNA NIVEL DE ESQUEMA (SCHEMA LEVEL) , MS PROJECT COLUMNA RESUMEN (SUMMARY)

Dado el ejemplo de la imagen, cual es la columna adecuada o compatible en Primavera P6 que me indique los valores de su contraparte de Ms Project?

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Hide Activity

Hello All,

 

A Native Primavera file need to be issued to Client but in that there are many activity which I do not want to show and the same havent been shown in the PDF file.

 

But can the Client see the hidden activity if it is unfiltered or by looking at the relationship of activities ?

 

Is there any way to hide activities which cant be seen even if you unfilter or trace the logic.

 

Thanks

Jithin

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Timely Distributed Schedule% complete Required

A
adab azeez 👤 Member for 9 years 10 months

Gents,

Greetings to everyone.

Hope You all are safe and doing good.

facing a small problem. Hope , will get some help.

I Have a 30 days project that is to be done in two shiftts (7:00-19:00 & 19:00 to 7:00) Calendar 24X7

I am required to note all the two shifts schedule percentage complete  at once, separately for both shifts. 

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Change in Budgeted Units

Hello Everyone,

 

I exported a schedule, rerouce loaded it and imported it back to the P6.

 

After checking some activity I saw that I for got to add some other resource for the same activity. But when I add this resource through Primavera it changes the existing allocated reource. I do not want that to happen. Please advice me on how to tackle it.

 

Example :

Activity A had a resource at First: Carpenter - 20 Hrs .

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

P6 Professional R19.12 Import Resource Assignment from Excel

My ASST SCN has a payrate of $39.62 as diplayed below.

figx_0.jpg

I export the below schedule with the respective activity resource assignments.

figx_4.jpg

The exported TASKRSRC worksheet displays as below.

figx_2.jpg

I import this Excel to a schedule with no resource assignments.

figx_3.jpg

When the Resources and Resource Assignments are imported I get the below.

figx_1.jpg

Why does the Price/Unit import as $1.00/h^?

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Best tool or report to track update logic changes?

J
John Reeves 👤 Member for 13 years 1 month

Best tool or report to track logic changes?  (hardest part of Update analysis) I have used some over the years "Change Inspector" , XER Toolkit, the former P6 claim digger which is a Visualizer report feature.  Which do you use?  Personally I prefer any that can easily be manipulated in excel because everyone has personal preferences.  Follow-up, how do you pull up you old forum posts? (I know I did a similar post but cannot find it)

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts

Milestone Trend Analysis

Willmer Ltd are delighted to announce the release of Milestone Tracker - software that creates Milestone Trend Analysis reports directly from Primavera P6, Microsoft Project and Elecosoft Powerproject.

This joins the family of products that import your projects from your favourite PM software including Project Tracker (S-Curves and Earned Value) and LOBTracker (Line of Balance charts).

Forum Sponsor

Top Posters

Nick Johnson-Pond
3 posts
sairedz25
0 posts
Ahmed Awad
2 posts
Syed Shoeb
0 posts
Vimukthi
0 posts
bal aji
2 posts
Lee Mallek
23 posts
Viet Tran
9 posts
Ola Gbotoso
0 posts
Jaturapit Multongka
1 posts