United States

Container
No

Featured Partner

Top Posters

Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts

Aegis Project Controls Officially Launch Rubix 5.5 in 2017!

Forums

What is Rubix?

Rubix is an analytical tool that improves project controls professionals’ scheduling efficiency and accuracy.

 

What scheduling software does Rubix work with?

Rubix works with Primavera P6™. (You can connect directly to a P6™ database or you can import XER files).  

 

What can Rubix do?

Rubix offers five functions:

Featured Partner

Top Posters

Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts

Featured Partner

Top Posters

Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts

Wrong total float

A
Ali Alali 👤 Member for 11 years 8 months
Forums

Dear Engineers,

Can i find an answer for my problem :

when i press F9 to attain the progress ,anticipated finish date goes to a logical date (in my project status)while total float is given me a misleading figure and not comply with anticipated finish date.

Finish date activity has  logic date and total float but overall project dont have a logic total float

Many thanks

Featured Partner

Top Posters

Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts

Existing practical project issues

Forums

Guys

 

I am starting this thread that we can share from our experience:

 

I met an issue in my new project. By Specifications I should receive a P6 schedule (cost and resource loaded). I just received the general view pdf. and another view(pdf) that shows complete different activities(each compiles several activities from the baseline). This new view has, for this compiled activities, loaded the cost. It looks like another Schedule of Value but is generated in P6 and from a Baseline of 500 activities shows only about 80 activities.

Featured Partner

Top Posters

Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts

Featured Partner

Top Posters

Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts

Public Sector Cost Estimating and Project Management - Efficient Project Delivery Methods

Forums

Interested in discussions and requirements concerning Efficient Cost Estimating and Project Management for DOD and non-DOD Public Sector facility renovation, repair, sustainability, and minor new construction projects - JOC, SABER, SATOC, IDIQ, MATOC, MACC, POCA, BOA.   Also RSMeans Cost Data, Cost Engineering, Custom UPBs (Unit Price Books).

Also integrations of the above with BIM.

[email protected]

Featured Partner

Top Posters

Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts
Hamzah Ahmed
0 posts
Quinton van Eeden
3 posts
Sunchana Johnston
12 posts
Akram Hammam Mohamed
17 posts
Sagar Raut
14 posts
Patricio_aoa
0 posts
James Williams
75 posts