Working within the BFA I was responsible to the Contracts Manager for planning all the works in Scotland being carried out under that contract. Projects were planned through their full life cycle from GRIP Stage 3 to 8, including logic linked technical, commercial, procurement and physical work activities phased through option selection, option development/outline design, detailed design, construction testing and commissioning, scheme hand back and project closeout. The projects included complete station refurbishments, major re-roofing, train shed roof refurbishment, demolitions, and new build / refurbishment of depots. I was also involved with tender planning and compilation including writing methodologies and safety compliance documentation for various types of Rail Construction and Refurbishment projects.
Core Team Senior Planning Engineer, Galliford Try (Infrastructure Division), BFA, Airdrie to Bathgate