Project Planning Engineer, Murray and Roberts Australia, Australia, Barrow Island, GORGON LNG Project, Pioneer Material Offloading Facility

START Date
END Date

Project Planning Engineer

June 2010 – October 2012 PMOF, Gorgon LNG Project, Barrow Island

Lead Planning Resource for design, procurement & construction of marine/ offshore materials offloading facility. AUD 500 million

• A 10,000 DWT barge berth and a 200m Ro-Ro vessel berth. The

barge berth and Ro-Ro vessel berth consist of 11 400t precast concrete

caissons which were shipped to

site on a heavy lift vessel and floated into position.

• A Module Carrier berth comprising a combi-pile wall structure.

• Seven berthing and mooring dolphins for the Module Carrier and Ro-Ro

vessel. The dolphins were prefabricated

steel tubular jackets with fenders and bollards attached for

berthing and mooring.

• A small craft landing to accommodate small craft up

to 20 m long.

• Two Navigation Aid Support Structures