Resource problem

Forum Topic

Hi mates. I am working on 18 hours calender, 2 Shifts (9hrs X2). I have been asked to use 10 riggers over all. So what would be our maximum units per time and default units per time.

Jul 4, 2018

DCMA 14-Point Assessment, Project Schedule Quality Analysis

Forum Topic

DCMA 14-point Schedule Assessment is a project management guideline established on 14 metrics that provide the possibility to make a qualitative and quantitative evaluation of the schedule. It is a handbook developed by the Defense Contract Managemen...

Jul 4, 2018

Gantt Chart is excel

Forum Topic

There are six methods of creating Gantt Chart is excel. attached excel filehttp://projectplanner.in/project-gantt-chart-different-methods-of-making-a-gantt-chart-in-excel/

Jul 5, 2018

Sample work break down structure for different Projects

Forum Topic

Attached sample WBS for1. Cross country pipeline project2. Oil Terminal Project http://projectplanner.in/projects/cross-country-pipeline-project/http://projectplanner.in/projects/oil-terminal-project/

Jul 5, 2018

Training

Forum Topic

A contact recently told me that he would be interested in attending training sessions that I present.So this is a market test to see if there is sufficient interest out there.The prospectus would be:Location: Premier Inn Meeting Rooms around the UK a...

Jul 6, 2018

A "Late Finish" Calculated from Free Float?

Forum Topic

Hello,Does anyone know if there is a form of a "Late Finish" that would be calculated as the latest date an activity can finish without affecting the start date of any of its successor activities? (i.e. Latest Finish where Free Float = 0)I have fabri...

Jul 9, 2018

Resource Shifts

Forum Topic

Greetings to everyone. I am creating a 24 hour Shutdown schedule.Now I Resources are being assigned. There are two working shiftsin this Shutdown first shift- 7Am to 7pm and second shift 7Pm to 7 am. My question is Is it necessary to create two shift...

Jul 10, 2018

Cost loading problem

Forum Topic

Hi guys am new to planning and i have a problem with cost loading...whenever i load non labour resource from the resource tab at the bottom view detail my cost will not register on the time line view in the budgeted non labour column...any help for t...

Jul 10, 2018

PP Project Controls Gathering (Motherwell, Scotland)

Event

[[wysiwyg_imageupload:5736:]]Meeting Number 001Location: Maxim 3, Parklands Avenue, Eurocentral, Motherwell, ML1 4WQTopics:We meet up, say hello and generally talk and complain about work issuesSuggestions for future gathering(s) (i.e. location, date...

Jul 10, 2018

Hey people! How's everything going?

Forum Topic

Carlos Arana here.I was just browsing old posts from when I started planning. I do not work construction project controls anymore, but man this forum was so fun and fullfiling.I miss the old discussing how SS and FF were useless. I see the yellow con...

Jul 11, 2018

Hierarchical coding structure

Forum Topic

I have set up a hierarchical project code so I can group geographically rather tahn use the cost driven WBS. However when I pull up the project code as a column I can't populate it.When I select the blank field I expect to be abe to see the structure...

Jul 11, 2018

S-Curve analysis

Forum Topic

Hello everybody, Please, can you comment on this S-curve and give us some explanation about it?waiting your comments....regards[[wysiwyg_imageupload:5737:]]

Jul 11, 2018

Planning Planet Events: Form Real Connections

Blog

It is so easy to find connections and engage in business with others over LinkedIn or email – just click ‘connect’ and you’re done. However, nothing quite compares to old fashioned face-to-face conversations; you can easily make more progress in a 10...

Jul 12, 2018

P6 || Duration changes post calendar change

Forum Topic

Hi all, Apologies if this has been posted - I did try and look for a similar example. I'm trying to understand why my durations are changing when I change from a normal 5d week calendar (8hrs per day) to a 5d week calendar with non-working days throu...

Jul 13, 2018

New Primavera 17.12.1 set-up with SQL 2014

Forum Topic

Hi all,I am installing Primavera PPM V17.12.1 with SQL 2014 Express database on our company server.Q1: Is this a workable longterm solution. Will the Express SQL DB be able to handle a large program of projects over the long term? Q2: Any specific is...

Jul 17, 2018

How do you baseline metrics for your project?

Forum Topic

My company currently has a Statement of Work (SOW) static document that is supposed to be developed and approved by the end of Planning phase.  This SOW is not between our company and a vendor like most SOWs.  This SOW is between the PMO and the busi...

Jul 19, 2018

Single Resource for Multiple Concurrent Activities

Forum Topic

Hello,The owner is requesting a schedule that has an "access" resource assigned to each activity, but several activities will be performed from the same "access" concurrently in the same location.We have a travelling scaffold system from which eight ...

Jul 19, 2018

Guild Registered Consulting Partner

Page

GUILD OF PROJECT CONTROLS (GPC) REGISTERED CONSULTING PARTNERThis is our effort to help YOU, our community and it is about having a product in your portfolio that any Organisation with a Project Controls environment will be interested in. This is a G...

Jul 19, 2018