Primavera P6 and What-if Projects

Forum Topic

Primavera P6 Projects may be assigned one of four states: Active, Inactive, Planned, and What-if. These states are useful for generating reports on the entire portfolio of projects.This article looks at each of these http://ow.ly/4mW8DE

Apr 21, 2016

Get Remaining costs updated after actuals updated

Forum Topic

Hello everyone,this is my first post on this forum but I've been coming here for years when I was looking for some answers. I've been using the search tool but as I couldn't find anything I thought I would ask your opinion.Normally when I create an a...

Apr 22, 2016

Duration automatically changing from 1d to 6000w

Forum Topic

Hi, trying to do a college assignment and mid way through programme, when I enter 1d for a duration it jumps to 6000w. Has anybody had a similar issue or know what setting will rectify this. Thanks

Apr 22, 2016

Program to complete works beyond the Contractual Time to Complete.

Forum Topic

I am working as an Engineer for a Building Project.Our Contractor has failed to complete the Works within the Contractual Time for Completion.  The delays are solely attributed to the contractor.  Now, we would like to receive from the Contractor, hi...

Apr 23, 2016

Cost of level of effort activity

Forum Topic

I have a level of effort activity with duration % complete. Cost is assigned to it as material resources price. But the cost is not getting distributed through the duration of the activity. In the profile/spreadsheet, the cost just stays in the start...

Apr 24, 2016

Maximo and p6

Forum Topic

Hi all,there is any method to link maximo with p6. in other words in the companies who are using maximo what the best method to integate  the work  otherwis there will adouble work and seprate islands in both sotwares.Anyone please can inform the opt...

Apr 24, 2016

ms project for construction of dam

Forum Topic

hey everyone,Actually i am trying to create planning and schedulling for construction of dam using ms project.can somebody upload any sample ms project file for construction of dam

Apr 24, 2016

Planned Value - Calculated from Baseline Schedule

Forum Topic

Dear All,  Introduction:We are preparing for a revised program (Rev.2), the baseline program (Rev.1) already having in-progress activities and will be considered as a baseline for Rev.2 program. The planned dates and planned values to be calculated f...

Apr 24, 2016

Wrong Critical Path

Forum Topic

Hi Friends,My issue is i am getting wrong Critical Paths & i know it is wrong.How can i tackle it.Links are properly connected.Please give the solution. Regards, Vigeeth

Apr 25, 2016

Issue Exporting Version 15 to Microsoft Project

Forum Topic

Dear Primavera wizards,I am having an issue exporting version 15 to Microsoft Project.  Normally, in previous versions, I seem to recall exporting to .mpp files.  This version only gives me the option of .xml's (2010, 2007, 2002/2003) and MPX.  This ...

Apr 25, 2016

Primavera EPPM vs PPM license

Forum Topic

Can a P6 Pro (PPM license) be used to connect to EPPM database? Will that break the license agreement? We Currntly have PPM license and we want to start buying EPPM going forward. EPPM wont connect to PPM database but PPM can connect to EPPM database...

Apr 25, 2016

Check Schedule in P6 Web

Forum Topic

HelloI have an issue with the function Check Schedule. It does work for projects up to 1500 activities but not if there are more activities.Is there any setting within the web server which limits the size of a file? Do you know any other reason?I'm u...

Apr 25, 2016

Need sample PMS

Forum Topic

Hello, Can anyone please send me the sample PMS in MS-Excel format, because i am not having primavera software. mail me to: [email protected]

Apr 26, 2016

Remain early start and finish

Forum Topic

I am doing an update for which one activity needs to finish on May 2nd and its saying remain finish cannot be earlier than remain start. Remain start is May 17 and I manually tried to change it but it's going back to May 17. What to do. Please help n...

Apr 26, 2016

Video - Creating a Work Breakdown Structure (WBS) in Primavera P6

Forum Topic

One of the first steps in planning a project is to break down the project by its major deliverables, i.e. the product or service components. An organized hierarchical break down or decomposition of all the deliverables is known as the Work Breakdown ...

Apr 27, 2016

Production rates for Indonesia Construction

Forum Topic

Dear All May I request for Production rates for INDONESIA construction industry.Rebar fabrication and Installation as one of my concerns. Thanks mate, eddy

Apr 28, 2016

Resource Hammock

Forum Topic

I am trying to automatically create several hammocks whose start will be defined by early use of a given resource and its finish will be determined by the late finish of the resourceuse by its predecessors SS/FF. The resource FM1 TO FM10 will be allo...

Apr 28, 2016