Productivity Reference in P6

Forum Topic

I hope I am not putting myself in trouble. I have transferred a productivity book to P6. It's from the KSA Chamber of Commerce dated 2007. I wanna share it but I am thinking I might be putting myself into trouble. It's almost 98% done but I don't hav...

Sep 19, 2010

P6 Export of estimated weight and user cost in WBS level

Forum Topic

Dear all,In WBS page we have the Estimated Weight and User Cost for each WBS i try to change these values using any tools but i failed also try to export them in excel but also failed.i try to add different weights like Cost weight, Equipment weight,...

Sep 20, 2010

How to keep activity dates after levelling resource

Forum Topic

Hi everyoneI have a problem with preserving dates after leveling. For example i have totally seven activity; six of them linked FS  and other one is not have any successor or predecessor. Thats why two activity start with project start. After applyin...

Sep 20, 2010

Lost resources & Cost during export/import

Forum Topic

Hello Guy! I have problem regarding my schedule loaded with resources & cost, everytime I export and import the project I lost the budgeted cost that I have loaded in each activity.. Any solution to my problem...

Sep 20, 2010

Construction in Tanzania

Forum Topic

Hi Everyone, I want to get a brief idea about typical working hours, methodology and plant used in construction in Tanzania. Thanks in advance. Re, Kin

Sep 21, 2010

Primavera 6.1 Log in Problem

Forum Topic

A bit of a strange one this, we are using P6 on a server, I can log in as myself without any problems, but when I try to log in as admin I get an error message and get booted off, but strangely others can log in as admin on different computers withou...

Sep 21, 2010

Building of paper combine

Forum Topic

Misters, good afternoon! Share practical experience of planning of building of paper combine. Thankful in advance

Sep 21, 2010

Resequencing programme

Forum Topic

Hi everyoneHow do i resequence a programme half way through the project.can i freez all the progress  and move the bars to a future date.what is the best practice.i work with asta power project.Thanks

Sep 21, 2010

Export Activities and Resource quantities

Forum Topic

Hi...my request is the follow... I need to export the activities and the resources for each one of them...but with the quantities of each resource asigned...i put the column resources but only appear the name..no the quantity...so...how i can export ...

Sep 21, 2010

Start Milestone FS Task Dependent Activity (Date problem)

Forum Topic

HELP! Well I thought this problem was taken care of in P6.7, but so far I’m not seeing it.  I have a START MILESTONE tied to an activity by way of (FS).  My milestone start on 9/15 and its successor should on 9/16, but instead it start on the same da...

Sep 21, 2010

Escalator Installation

Wiki Page

Modular Design Escalators PackagesThe escalator trusses are usually delivered in 1.6 m cubes, which include the internal workings etc. Normally 3 to 4 sections go to make up a standard escalator (an 11 m rise), however sizes and lengths vary greatly....

Feb 7, 2009

Road Markings

Wiki Page

Road and Car Park Markings 75 mm road lines = 20.5 m/hr Road writing = 3.5 hrs/word or symbol

Feb 8, 2009

Road Surfaces

Wiki Page

Barber Greene 8798 machine laying 100 mm in two coats (m2/hr)... Tarmacadam = 160.0 Asphalt = 145.0 Manual laying 100 mm in two coats (m2/hr)... Tarmacadam = 7.7 Asphalt = 5.0 Average laying of Asphalt wearing Course=40 Ton/hr so one crew can do 400 ...

Feb 8, 2009

Covered Steel Footbridge

Wiki Page

Simple universal beam steel bridge in modular sections, welded on site. 16 truss sections each 15 m in length, supported on H-frame vertical columns / supports.Support Steelwork Fabrication (4 bays) = 25 daysSupport Steelwork Erection (4 bays) = 30 d...

Feb 8, 2009

Soft Landscaping

Wiki Page

SoilSpread topsoil, prepare for turf/seeding = 2.5 m2/hr Spread fertilizer and rake in = 25.0 m2/hrPlantingHedges or Shrubs, ne 750 mm high = 4.0 no/hr Hedges or Shrubs, exc 750 m high = 1.5 no/hr Saplings, ne 3.0 m high = 1.7 hrs/noTurfingTypical ra...

Feb 8, 2009

Wall & Ceiling Coverings

Wiki Page

Paper CoveringsWall paper and lining paper = 5.00 m2/hr Vinyl and washable papers = 4.20 m2/hrCeiling lining paper = 4.00 m2/hrRates in relation to one skilled craftsman and labourer.Wallpapering...Task / DescriptionSlow  Ave  Fast   Units Strip Exis...

Feb 8, 2009

The Purpose of the Project Schedule

Wiki Page

The project schedule is one of the most important tools in creating a successful project (usually after building a good team). However, the true value of the schedule is only achieved if several other tools are implemented and integrated. To develop ...

Feb 10, 2009

Baseline Schedule

Wiki Page

The client-approved schedule that reflects the plan for implementing a project. This schedule reflects no status, and is sometimes referred to as the “target schedule.”

Feb 10, 2009

Critical Activity

Wiki Page

Any activity on a [[critical path]]. A delay in a critical activity will delay the project.

Feb 10, 2009

Critical Path

Wiki Page

关键路径是决定项目最小可能持续时间的活动顺序。当在[[网络图]中查看时),关键路径是到项目结束的最长路径。如果网络图仅包含完成至启动关系,则关键路径上任何活动的延迟都会延迟[[完成日期]]。如果它包含其他类型的关系(SS,FF,SF),这可能并不总是反映在项目管理软件中。 例如,考虑一个包含2个活动的网络:活动A具有10天的持续时间,并且具有与活动B的开始与开始关系的前驱20天。大多数PM软件将表明这两项活动都处于关键路径上,但该软件将允许A延迟10天而不延迟项目完成。事实上,由于软件算法在识别...