Internally
Wiki PageOne coat primer, 1 undercoat, 1 gloss 2.40 m2/hr As above to steel stanchions and beams 1.30 m2/hr As above to balustrades, railings etc 1.40 m2/hr
One coat primer, 1 undercoat, 1 gloss 2.40 m2/hr As above to steel stanchions and beams 1.30 m2/hr As above to balustrades, railings etc 1.40 m2/hr
One coat primer, 2 undercoats, 1 gloss 1.70 m2/hr As above to steel stanchions and beams 0.90 m2/hr As above to balustrades, railings etc 1.00 m2/hr As above to gutter and downpipes etc 2.50 m/hr
Excavate By Hand Trenches (m3/hr) Depth in Metres->Ne 1.51.5-3.03.0-4.5 Sand/Soil lose0.660.450.33Sand/Soil firm0.570.380.28Gravel0.450.310.23Clay/Heavy Soil0.460.310.24Boulder Clay0.380.260.19Pits or Bases Ne 2 m2 (m3/hr) D...
Rates include for making, fixing, cleaning and minor repair works etc, rates in m2/hr.Soffits - On runners and props, including erection of props etc. Hight of Beam Soffit---> 0 - 3.5 m3.5 - 5.0 mWidthFixStrikeFixStrike 100 - 200 mm0.701.230...
Mixing By HandA typical rate of 0.32 m3/hr of concrete. Compulsory Paddle Mixer Generally with one or two 3.5m3 drums, giving a cycle time of 60 to 80 seconds (m3/Hr). Mix Time -->60 secs80 secsSingle drum plant210158Double d...
Barrowing Concrete (m3/hr).Receive concrete from mixer/lorry direct to barrow, wheel to placing position, tip and return.Distance0 - 10 m2.32 10 - 20 m1.81 20 - 50 m1.08As above but including load concrete from deck/tray. Distance0 - 1...
Typically carried out with a gang of 2 layers and a single labourer. Typical rate of 3.15 m2/hr
· Lay sand and cement floor screeds to accurate levels and finish with steel/wood float. Rate apply to a gang or 2 labourers and 1 screeder with materials being delivered by hoist and barrow. Screeding Rates (m2/hr) Thickness -> 15 to 20m...
· Typically carried out with a gang of 2 layers, 2 labourers and 1 polisher. In situ flooring 3.60 m2/hr Precast flooring 4.65 m2/hr
Standard tiles of 0.045 x 0.045 m. A typical rate of 1.55 m2/hr
Typically installed by a 2 man gang Medium sized room incl cutting 2.67 m2/hr
Parquet and Wood block floor systems Lay Blocks 1.5 m2/hr Clean, sand, polish 3.1 m2/hr
Budgeted Cost of Work Scheduled (BCWS) is used in Earned Value Analysis For a fuller understanding, this Wiki entry should be read in conjunction with ACWP and BCWP. BCWS is the cumulative budget cost of doing work as defined in the Base programme....
Actual Cost of Work Performed (ACWP) is used in Earned Value Analysis For a fuller understanding, this Wiki entry should be read in conjunction with BCWS and BCWP. ACWP is the Actual cumulative cost of doing work, and is usually compared to the c...
Budgeted Cost of Work Performed (BCWP) is used in Earned Value Analysis For a fuller understanding, this Wiki entry should be read in conjunction with ACWP and BCWS. BCWP is the cumulative value of the activities complete (or partially complete)....
Here is an example for start to finish relationship Let us consider a scenario Roof slab concrete is to be poured to a structure which is an expansion to an existing building. The formwork is done, the reinforcements have been done and dowel rods fro...
Critical path DRAG (Devaux’s Removed Activity Gauge) is a new scheduling metric in critical path analysis [[critical-path-method]]. It is the amount of time that an activity on the critical path [[critical-path]] (i.e., the longest path through the...
News Update: PP WikiPlanet Wiki / Knowledge Base has arrived, join those planners in adding content.... http://www.planningplanet.com/wiki/ The Wiki is an online collaborative knowledge-base that can be contributed to or utilized by anyone with skil...
NEWS FLASHPP now has a contact number in the UK!Two new PP admin members have joined today and are available on the following number: Call us on +44 (0) 7931 - 373435 You can call the team and / or leave a voicemail for any issues you may have or d...
Dear members...We are introducing Coroporate Subscribers to PP!!Why should Organisations be interested???Here are some BIG reasons:Promote your Company and the experience it has in Planning and Project Controls.Encourage your team to utilise PP -Impr...