Progress measurement systems

Forum Topic

What is the best Progress measurement systems on the Market. I am looking for a Software package that think assigning ROC in line with Deliverables and linking to the Schedule. WOW I need something that Link Milestone to the schedule and not the deli...

Feb 2, 2011

Actual % complete is showing wrong

Forum Topic

Dear All I am updating the progress for my present project.the project updation is done for every one month.this is the first month of updation.the acitivites are task dependant.duration type- fixed duration and units/time.% complete type- duration t...

Feb 2, 2011

Am I missing a contraint?

Forum Topic

My P6.7 schedule is producing late start and finish dates (and hence strange float values) which are before data date and even project start date. I have checked all obvious constraints. What am I missing?

Feb 2, 2011

manhours waste storn water pipe provision

Forum Topic

Hello everyone,Anyone has manhour table regards to infrastucture works? Like waste, storm water piping based on diametre, or manholes production and provision etc.??I checked out planningplanet ;however, i couldn't come up with a solution. I need det...

Feb 2, 2011

Controlling & Organizing posts

Forum Topic

I remember Pareto's law as i watch the posts on the website. Few people share are sharing their highly valuable experiences, Many people are posting only requests for sample projects, documentation etc. While one or two requests are understandable, r...

Feb 2, 2011

Facing Problem with Early dates logic

Forum Topic

Hi Friends,                 While updating P6 schedule, i'm trying to enter actuals on finish date upon 100% completion of the activity, but i can't able to update actual date rather which the system responding like "Remain Finish date cannot be earl...

Feb 3, 2011

P6 V7 vs. 8

Forum Topic

We are currently looking to migrate to upgrade to either of these from version 6.2.1.   Asside from the differences published by Oracle, are there any other things that I need to look at?   So I post this question to all you knowledgeable folks out t...

Feb 3, 2011

P6 V7 vs. 8

Forum Topic

We are currently looking to migrate to upgrade to either of these from version 6.2.1.   Asside from the differences published by Oracle, are there any other things that I need to look at?   So I post this question to all you knowledgeable folks out t...

Feb 3, 2011

How to create a 2wk look ahead schedule in P6

Forum Topic

Hi all, I am still finding my way around P6 and would like to know if anyone can giuve me a step by step outline of how to create a a 2wk look ahead filter. I am familair with creating filters but have never done one for a look ahead.My two main ques...

Feb 3, 2011

How to create a 2wk look ahead schedule in P6

Forum Topic

Hi all, I am still finding my way around P6 and would like to know if anyone can giuve me a step by step outline of how to create a a 2wk look ahead filter. I am familair with creating filters but have never done one for a look ahead.My two main ques...

Feb 3, 2011

Three months forward planning

Forum Topic

HelloI try to create a filter to show me the heads of the planning task three months ahead.I tried to use the filter of time ranges. But it gives me too many tasks. I'm looking for something to give me the main tasks (summary tasks)I tried to do a gr...

Feb 20, 2011

Primavera P6 Professional- EPS

Forum Topic

Hi everyone;  I've recently installed Primavera P6 professional release 8 on my PC. I'm having difficulties in building the EPS using this new software. Can anyone tell me how to build-up a new EPS using this software? thanks in advance   wissam

Feb 20, 2011

Design basis for Manhour norms

Forum Topic

Manhours is a single word very commonly used to measure time, cost and effectiveness of supervision. There are lot of books, literatures and theories available in the market but none of them lay down the design basis of calculation of the same. Why d...

Feb 20, 2011

Pinoy Planners

Forum Topic

[[wysiwyg_imageupload:246:height=72,width=55]]Hello to All Pinoy Planners,Here is the Forum Group that will bind us all together for the betterment and advancement of our specialized profession.Join here. http://www.planningplanet.com/groups/500842/p...

Feb 20, 2011

Manpower Estimation for Airport Projects

Forum Topic

greetings to all, I'm working in the New K.A.I Airport Project in Jeddah-KSA. I'm trying to estimate manpower needed to deliver the project on time. The project is a Lumpsum design-build project, thus unfotunately I don't have drawings nor detailed B...

Feb 20, 2011

Last Planner System

Forum Topic

The purpose of this is simply to create a space for discussion of issues related to the Last Planner® System (also sometimes known as Collaborative Planning, Workface Planning, Lean Planning, Pull Planning, Right to left planning, Short-term planning...

Feb 21, 2011

Gantt Chart Activity

Forum Topic

I am a beginner at primavera, i need to know how one can change gantt chart to show one day activity occupying the whole duration, like in this example activity starts somewhere mind sunday and ends in mid Thursday, where as I want it to start from t...

Feb 21, 2011