Resource Usage Spreadsheet Distribution Issues

Forum Topic

Hi , I have a project, for which I have resource loaded an "X" engineering discipline. The monthly distribution, looks ok, but when I zoom to see the weekly distribution, it dosen't show a proper resource histogram. Thereby i thought to re-adjust in ...

Jan 15, 2021

Creating an Alert message box in MS PRoject

Forum Topic

Dear all, I would like to create a message box in MS Project that appears once the date of a particular milestone in a Plan of Work has changed. In this example, I have a task finish date that is the end of the project "Project End". While working on...

Jan 15, 2021

How to upload a set of Activity Codes?

Forum Topic

Hi All, I have created some Activity Codes to be assigned for accounting purposes. The first stage was easy as there were only 8 groups and maybe 5 or 6 codes within each group.Sample: Code Value Description2 Tailings/BPF Area  2.1 C-12394-01-02-05-0...

May 20, 2022

How to upload a set of Activity Codes?

Forum Topic

Hi All, I have created some Activity Codes to be assigned for accounting purposes. The first stage was easy as there were only 8 groups and maybe 5 or 6 codes within each group.Sample: Code Value Description2 Tailings/BPF Area  2.1 C-12394-01-02-05-0...

May 20, 2022

Delay Analysis

Forum Topic

Dear Friend ,i am working on project which has been delayed from start as the work from hold by the client in the beginning.The baseline was approved , however after the resumption of work the contractor made a new schedule by changing , adding , del...

May 21, 2022

Primavera - compareing a positive schedule to a negative.

Forum Topic

Best way to handle the following:  Target (same month) has negative float.  Revision of same month has no negative float (recovery schedule) -  I don't think I can show Target Float, also the Targ. Start and Finish are goofy - I assume that is becaus...

May 23, 2022

IF OR Fuction

Forum Topic

Hello All, Need a help.A formula to calulate the % duration complete based on IF OR function in excel    Today = (D)28-May-22ItemABDuration% CompleteItem 123-May-2228-May-226B=D,100%, A<D,B>A,(D-A+1)/(B-A+1)Item 225-May-221-Jun-228  ThanksJithin

May 24, 2022

Large Activity Filter

Forum Topic

Hi All you Brainiacs! Have any of you found a way to autocreate a large filter? I have about 75 Materials Delivery milestones and I want to show their Successor/s So my filter terms would be:Where Predecessor = (insert Milestone id)orWhere Predecesso...

May 27, 2022

% Complete Confusion - here is the data...

Forum Topic

April 29 Data Date April 29 Actual start on activity Orig Dur = 20 Actual Dur = 5 Rem. Dur = 20 Per. Complete Type = Dur. Dur. Complete = 0% Sched. % Complete = 45% - how is this possible.float -39.Should I tell the contractor it has to be wrong to h...

Jun 2, 2022

Good News for all Primavera SDK Magic Tool Users

Forum Topic

Good News for all Primavera SDK Magic Tool Users.Register Link:https://www.facebook.com/P6.MagicTools/posts/pfbid0RwfQK9bzbytb1Wmo8vf3Mq8SnGwG1MLRjUeo3d2MtqWQLhVLNGfYVcMu6p2UTGA5lNew Feature:Draw all S-Curves, Histograms and Cash Flow of Primavera Pr...

Jun 2, 2022

Effect of a Crew on Productivity

Forum Topic

Hello,I've multiple crews working on the same activity type, but diferent buildings.Assume the are steel fixers and the overall productivity is 100kg/day for today, and by simple analysis, I found that 50% of crews (Group A) produced 150kg/day and th...

Jun 10, 2022

Longest path in under specific WBS

Forum Topic

Hi All, I am working with 20 different construction under one P6 Program. Example WBS as below;   1. Facility Construction1.1. Block A1.2. Block B1.3. Block C and goes on. they are not connected to each other. their only intersection is project start...

Jun 14, 2022

NASA RIDM Handbook SP-2010-576

Forum Topic

Hi, has anybody used this handbook to inform their E&C Risk Processes? Seems highly technical and couched in risk language for the average risk planner.thanks

Jun 17, 2022