relationship lag scheduling - detailed calculation algorithm

Forum Topic

Hi,Any suggestion on where to find a well-detailed explanation of how the lag between different activities in P6 are scheduled?I am experiencing some strange behaviors in particular cases, for which I am not able to provide a rational explanation.e.g...

May 1, 2018

132 kv substation turnkey project schedule

Forum Topic

I am involving in a planning of turnkey Substatiin construction in India.It is completely new field to me.Can any ine suggest with the sequence of activities which is normally used.If possible any sample schedule of it to get overall idea.

May 1, 2018

P6 SCHEDULE PROBLEM!!!

Forum Topic

Hi guys,I have a problem with my p6.I am done with my planning and I want to put my new data for the next month manually;*First problem=When I  click the start box in status bar and change the data with a different date finish box doesn't change auto...

May 2, 2018

The two projects are linked together

Forum Topic

 CHĂM LO CHO SỨC KHỎE CỦA MẸ!Điều được nhắc đến nhiều nhất trong tình cảm mẹ dành cho mỗi người con hẳn là tình yêu bao la trong lòng mẹ. Khoảnh khắc bé yêu chào đời, cuộc sống của mẹ như có thêm vô vàn màu sắc. Để chuẩn bị cho điều ấy, sức khỏe của ...

May 2, 2018

Converting to MSP form Asta Powerproject

Forum Topic

Can anyone tell me how I show the baseline programme on an import from Asta Powerproject?I have converted it across from Asta and it's displayong the as-built but not the baseline. Is there any way to show this on the converted programme? Also it loo...

May 3, 2018

9days delayed

Forum Topic

Hello guys It's the last day of the month and I have been assigned couple of projects to update, I have updated most of it but I have 2 projects left to update. One of this projects already have 9 days delay with a terminal float duration of 6 days. ...

May 3, 2018

What Makes Project Risks Hard to Communicate?

Forum Topic

Projects are immense endeavors and as a project director or manager you realize that projects include dangers and imparting those dangers is an exceptional ability.What Makes Project Risks Hard to Communicate? 

May 4, 2018

EPC Engineering Planning

Forum Topic

Hi,Need Some Expertise on Engineering Planning for a Small Refinery Project Let say 1000 Equipments:1. How many total Engineering manhours Should be Estimated based on Number of Equipments ?2. How long the Engineering Will go to give Sufficient Front...

May 5, 2018

Late Start and Late Finish date issue while importing

Forum Topic

Hi there!I am currently facing this issue wherein when I import a program into another computer the late start and late finish dates change. So technically my entire float is changing.Any reasons why it might be so? I checked the calendar. It is same...

May 7, 2018

Cost loading in P6

Forum Topic

Why we prefer to use Nonlabor resource in BOQ loading on the schedule instead of labor and material resource?

May 7, 2018

duplicate key in object 'dbo.TRSRCFIN'.

Forum Topic

Hi everyone,I am working on a system running MSSQL and P6 EPPM v15.2.Trying to import a schedule backup in XML form with baseline into the database through P6 client.SEVERE: DBEngine.executeUpdate: Violation of PRIMARY KEY constraint 'pk_trsrcfin'. C...

May 8, 2018

Trouble Importing XLSX

Forum Topic

Hello there!I am having issues while importing units and durations on P6, using XLSX files. When I import floating point values, it ignores the decimal point and import as an integer. For example, importing 12.05 and it writes 1,205 in the database. ...

May 8, 2018

Performance % Complete Change After Assigning Baseline

Forum Topic

I've Oracle Primavera P6 Professional R16.2Project WBS contains 10 Major Items (Sites)Contractor send update, I assign Baseline for compare Schd % against Perf %the problem is, one of the sites' Performance % Complete Changes after I assign the Basel...

May 9, 2018

need detail about tracking windows layout

Forum Topic

I need a document detail explanation about the benefit and implementation of tracking window primavera p6. But I search a lot could not finding not find everything in detail regarding tracking window ond tracking layouts.down votefavorite 

May 10, 2018

Calculation of delay duration - forecast PC vs contractual PC date

Forum Topic

Hi allplease assist me in the following matter:A recent project has been the subject of numerous (approx 300No.) notifications of potential delay and 25No. actual EOT claim submissions by the Contractor. These have largely been rejected by the princi...

May 10, 2018

Error in P6 R16.2 importing

Forum Topic

I am curious if anyone is experiencing this issue. I can export a .xlsx from P6 R16.2. I can open the file just fine in Excel . However, if I save it in Excel  without making any changes and try to import it into P6 R16.2, I get this error: "The User...

May 10, 2018

Problem installing Oracle Primavera P6 R 8.2

Forum Topic

Hello everyone, I'm trying to install a standalone version of Oracle Primavera P6 R 8.2 on a computer that has Windows 8.1. I have already installed Java (Java 6 update 27), OracleXE and P6. Now, I'm trying to run the "dbsetup.bat" batch file to conn...

May 14, 2018

XLS import privileges setup issue

Forum Topic

Planners,I wonder if one of you can help me with this privileges setting issue. I have created a new database with different global and project profiles. The problem I am having is that users cannot import from an XLS file, it only seems possible to ...

May 14, 2018