progress duration will go the same as baseline duration

Forum Topic

To everyone please,I’m new in primavera.  I just want to ask why is it that when I execute Update Progress in P6 the Actual Progress Duration will go back to each Original Duration, same as Baseline, even if the Actual Progress Duration is different ...

Dec 26, 2010

Total Delay

Forum Topic

Hi Planners I want to share an interview question that was asked to friend of mine in an interview and he answered that wrong but the interviewer explained him the correct answer. The question was: If an activity is delayed by 4 days on February 28 h...

Dec 26, 2010

Longest Path with Mixture of Positive and negative float

Forum Topic

Dear All, My program is showing longest path in P6 , with some activties which has a positive float of 135 days also, as well as Zero days float. How could it be possible to generate longest path with positive float and zero float. Can anybody explai...

Dec 27, 2010

Performance % complete to be shown as BL1 Column

Forum Topic

Dear All, Why dont we have a column to choose Baseline perrformance % complete in P6. How can we get a column to show this ?? Any ideas from any expert. regards,   Haresh Jayanth

Dec 27, 2010

standard man hours

Forum Topic

Hello,I am looking for standard man hours related to the high rise building design. I am working for a building company that won the bid for a tower (38 floors). We need to transform the bid drawings in building drawings but we are late and actually ...

Dec 27, 2010

Printing errors

Forum Topic

hello to everyone, I need some help, this is the situation,why when I do printing for Microsoft program its apper ( THERES IS NOT ENOUGH MEMORY TO COMPLETE THE OPERATION ) even when I restart to my PC then reprint again nothing change i? Can you plea...

Dec 28, 2010

Resource Histogram Units

Forum Topic

 Dear All, Primavera P6 "While creating Resource Histogram by Using Resource Usage Profile (Resource Histogram), The X-axis is Time Scale (by Default) But Y-axis is coming in Hours (h) , i need it in "Numbers"  Say Example, im generating Resource His...

Dec 29, 2010

P6 Error

Forum Topic

Folks, who's got a clue how I can solve this problem... Thanks I imported a ver 6.7 project file into ver 6.2; it imported ok I tried to import some layout files (.PLF file) and got the error message  ‘[QT_DAY=5]’ is not a valid floating point value ...

Dec 29, 2010

Unify Project and Convert External Links in Local Links

Forum Topic

Hi...i have the following question.I created a 7 individuals projects and afeter i created 1 project where the 7 originals was inserted, and this one project call the others and the external links into project was created....but i need to unify in on...

Dec 29, 2010

Import Multiproject Plan in P6 from MS Project

Forum Topic

Hi everyone.Well my question is the following...how i can import in P6 a multiproject plan from Microsoft Project?...I explain me, I have in MS Project a Project Plan conformed by 7 individuals projects plan (7 individual files) and linked by externa...

Dec 29, 2010

Unresolved Mystery of timing in P6

Forum Topic

I have a strange problem in my program. I have given a lag of 21 days. The predecessor activity is completing by Dear All, I have a strange problem in my program. The successor activity is starting on the same day, when predecessor activity is comple...

Dec 30, 2010

Error in Login - User already log on..

Forum Topic

Hi to All, I have experience some error in login to P6 as follows: I have regularly using the P6 client from a server and suddenly one day i got an error in login saying... "The user already log in..." What was the cause of it and How to resolve? Tha...

Dec 30, 2010

P6 Training in Doha

Forum Topic

Currently using P3 and feel like obsolete already. I would like to have training in P6 in Doha, Qatar. Anyone know good traininag centre? How much is the cost?

Dec 30, 2010

METRO STATION SCHEDULE

Forum Topic

Dear All,   Can anybody share  a construction schedule for the metro station construction.   Rohit

Dec 31, 2010

Conditional Scheduling

Forum Topic

I already worked out my first switch activity and works perfectly when using dates of the switch activity itself, but I would like to make the condition to compare field values of other activities. Say Switch activity code is 100 but would like to co...

Dec 31, 2010