Free Webinars in February 2021
Forum TopicHere is a list of free project planning & scheduling webinars that will take place in Februaryhttps://www.plannersplace.com/blog/free-webinars-feb-21
Here is a list of free project planning & scheduling webinars that will take place in Februaryhttps://www.plannersplace.com/blog/free-webinars-feb-21
Hi,I'm hoping somone can help me with the following problem I'm having with MS Project. I have a project with Construction Activities (Standard Calendar appropriate) and Shutdown Activities (operating over 24hrs, 7 days a week calendar).I can create ...
Hello Everyone, Can anyone explain how to calcualte the Forecast MAnhours for a Engineering Document/Delvierables. Say for Example DeliverableBudgeted ManhoursPlanned %Actual %Earned ManhoursActual ManhoursForecasted Manhours ABCDEFTank Foundation Dr...
HiI have started with P6 few months ago.My issue is:Tracking progress on status tab: task Fixed Duration and Units, % complete type Physical. I chek the started, then Remaining days and % Physical based on actual and remaining days. If the task is de...
Hi there.We submitted a baseline at the start of the project that was approved and had been following the same for some time. Then we revised the baseline by changing the construction methodology to change the sequence of activities and also the dura...
Hello all,I have successfully imported data to P6 via XL. I have some rather long "Activity Names" that refuse to wrap inside the field.I have tried ALL "Table Row & Font" settings to no avail.IF I copy the text into MS Word, then paste it back into ...
Hi all,Trying to Group & Sort by Start Date (Group Internal =Day) and can't seem to find a way to change the date format. In my User Preferences, I have the Date Format set as Day, Month, Year yet in the Group & Sort it shows as Month, Day (US format...
Hi,I was trying to download the Primavera PPM stand alone ver 18.8, from oracle website.No I am stuck at the window, asking for the connection string and the data base configuration with username and password.Have anyone experienced it while download...
Hi All,wondering if anyone has come across this before and has a solution at all?I've got a project with circa 250k hours remaining, and on 'Activities' screen all looks ok. When I switch to 'Resource Assignments', grouped by WBS, I have three resour...
I saw a scheduler do this once in P6 and I trying to replicate what he did. Say I need to be Finished on 12/31/19 and I have a schedule built out. How can I schedule from that date backwards essentially given me the latest start of all activities to...
I always use a manhours in my job (oil and gas) with budget in manhours and lot of things in relation with it,but i always ask in my mind a question,why we use Manhour unit in the planning ?
I have a role assigned to a LoE (fixed duration & units/time) which has a standard 5 day calandar.Budgeted units / time is 100% and the total budgeted units in the resource assignments window match the activity duration. Planned dates match forecaste...
I'm working with a contractor who has just reciently changed the remaining duration on a few un-statused activites in the latest update. This is based on the USACE schedule requirement:3.3.13 Original Durations Activity Original Durations (OD) shall ...
Hi everybody, I was using P6 6.0 without any problem. After some time , I ve decided the install SQL and installed. From that moment, I received database error from P6 when I try to log in. I tried to reinstall but nothing changed. In addition , whil...
Hello all,Here is the issue im facing;I made my activity list in excel with each WBS codes with the exact codes in Primavera. I then made one new activity in Primavera, exported the xls file, added the "Activity ID", "WBS code", "Activity name" and "...
Dear All; i have a question about milestone that i want to see if its should be done in 2 months could be warned by ms project? for example: i have a summary task that building reinforced concrete works, and i linked this after a "rebar procurement" ...
I am having problems intalling P6 on my machine. The following message is popping up:''Primavera P6 Professional R8.3.2 setup Wizard ended prematurely because of an error. Your system has not been modified. To install the program at a later time, run...
Hello,In my P6 current settings, the actual cost is calculated as Total Units * Rate. The total units are collected from the period units. Is there a way to collect the actual cost from the Period Actual Cost? Say, the actual cost in Jan is 100$, Feb...
I've tried updating a baseline in P6 and even if I change one activity by 5 days I receive the following error message in the log file. Assignment remaining start date cannot be earlier than activity remaining start date. Does the baseline not get up...
Hello, I recently created a schedule and have it sorted by start date. I had to add a new activity with same start date and time as my first 2 activities and when I created the new activity it sorted it 3rd in sequence. I'd prefer to see this new act...