P6 8.3 Install problem

I am having problems intalling P6 on my machine. The following message is popping up:

''Primavera P6 Professional R8.3.2 setup Wizard ended prematurely because of an error. Your system has not been modified. To install the program at a later time, run Setup Wizard again. Click Finish button to exit the Setup Wizard''.

I have tried several times and this keeps on happening.

How can this be rectified?