Changing Work Week in P6 Optional Client

Forum Topic

I am currently planning for a project which is running a Saturday to Friday workweek. Can somebody tell me if I can change the work week for this individaul project. I have been told any changes to the work week by admin will effect all projects unde...

Nov 21, 2012

3D Gantt

Forum Topic

Or how to read the project interfaces.http://3d-wbs.blogspot.fr/2012/11/part-53-3d-gantt.html

Nov 22, 2012

Border File

Forum Topic

I have been tasked with re-designing the border of all our programmes. We use ASTA, but what information would you expect to see in a border when you first look at it. I have my own opinions, but wanted to get a opinion base. Thanks Ronan 

Nov 22, 2012

Activity Type

Forum Topic

Wat is the difference between wbs summary and level of effort

Nov 22, 2012

Bringing whole schedule in by a month

Forum Topic

I have a schedule which the PM has asked for me to bring in by an entire month. He wishes to know which items (which perhaps aren't critical now) would become critical if the whole delivery was brought in by a month. I realise there a number of ways ...

Nov 22, 2012

Locking filter/view in MSP

Forum Topic

Hi, I need to distribute my time schedule to a subcontractor but I want to limit his access. Is there a way to lock the filter or view that I want him to see? I don't want to create a pdf or something like that. /Christian

Nov 22, 2012

Budget Analysis

Forum Topic

Dear All,I'm new to Project Controls and just started my job as a PC Engineer at a small construction company. My manager asked me to do a budget analysis (we are still in Design Development) so I really don't know what he means by budget analysis as...

Nov 23, 2012

new planning engineer

Forum Topic

dear i have 3 years QA/QC engineer. now i have done p6 traing and want to become planeer engineer.plz tell me how i prepare for interview . plz suggest some questions

Nov 24, 2012

Risk analysis in Spider

Forum Topic

Spider has a nice feature of probabilistic analysis of project completion date, cost etc. It is based on optimistic, pessimistic and most probable schedule scenarios.It is clear, that probability to meet optimistic scenario is 0%, pessimistic is 100%...

Nov 26, 2012

Technical Specifications for Scheduling

Forum Topic

Anyone have a sample of a detail technical specification for Scheduling, please forward a copy to my email address use private message service  Thank you.   Regards, Marie Albert

Nov 26, 2012

Project Progress Percentage in P6

Forum Topic

I need some assistance about progress percentage in P6. I want to know that how can compare my baseline (Planned) progress and current progres percentage in P6. I understand the concept of three types of individual activity percentages i.e. Physical,...

Nov 26, 2012

Activity codes in P6 for a shopping mall

Forum Topic

Hi, I have recently moved to P6 from MSP and therefore havea only a basic knowledge of P6. I am preparing a schedule for a massive shopping mall (2basements + 4 shopping floors +2 parking floors) and i wanted to know what level of activity codes need...

Nov 5, 2012

Weekly Reports

Forum Topic

Afternoon all, Quick query re reporting in P6..... Is it possible to run a report which shows all the activities that should have been progressed in the previous period but have not been?  I.E Basically at the moment I am filtering the P6 plan to sho...

Nov 5, 2012

"Composite" Timescale in MSP2010

Forum Topic

Hi, Hoping someone can help. I was wondering if MSP 2010 has the capability to show an "composite" timescale on the Gantt charts? By this, I mean something akin to P3 where you can showthe main timescale for the project duration on say a quarterly ba...

Nov 6, 2012

Problem with Import single digit lag from .DBF

Forum Topic

 I got problem in lag when I was importing from .DBF file. I am getting only two digit onwards, but I’m not getting single digit (from 1 to 9) in import. And I tried with decimal (like 3.00) places also and even two digits (like 03). Not able to impo...

Nov 6, 2012

S-Curve

Forum Topic

I made a P6 plan on the basis of manhours now i want to make a S-Curve on excel for manhours weight% vs time for daily progress monitoring. 

Nov 6, 2012