Baseline and Layers
Forum TopicHello PPers,Is it possible to assign two different layers to the current task and its baseline?Thank you
Hello PPers,Is it possible to assign two different layers to the current task and its baseline?Thank you
Hi All, Can someone please help me? I am trying to create a column titled Finish Variance CL14 and Finish Variance Last Period. I have successfully created these but don't know how to edit it or enter the formula to show me the variance/difference in...
Has anyone resource loaded their schedule with 'Equipment'? What unit of measure is best used? What kind of output do you produce and how is it useful to the project team?
Hi All, Is there any way ijn P6 to check which user had modified/deleted global resources? We can see that it can only have been the admin superuser but is there anywhere in p6 that would record this? Thanks
Hi PlannersI have a schedule with no logic inbetween sections of work and these are sequenced using resource levelling and priority codes.Im struggling to see multiple float paths, does p6 require logic to do float calcs and forward and backward pass...
I just started recently in scheduling and I only have a basic skills in linking activities, please I need an advice to apply it in P6. "Relatioships" or "sequencing" of activities are based on experience and logic. Suggestion please, where/how can I ...
How the primary resource reflect time sheet , is this in primavera file and if in excel or any other format how to prepare to match with primavera to arrive for admin (P.M) to approveplease any one inform me how the primary resourse creat time sheet ...
Hai Some of the activity Resource Original Duration is not Equal Activity original duration . This issue occur where single activity have Multiple resource . Activity Type is task Dependent , Duration type is Fixed Duration & Units /Time, Percentage...
Hi ALL, I am planning for installation of equipment for five buildings each. each building shoiuld be connected to a finish activity. One building is a priority and will finish early which will give me huge float as it should be connected to the fini...
Can anyone please provide me the cost & scehdule data of a recent refinery project in the middle east. Thhx
Hi All, I have an easy beginner question. I have a resource-loaded schedule and put in the reamining durations and actuals in place. The data date is somewhere in the middle of the projet lifetime and I need to get the forcast for futre time interval...
Question: Is the web based version of P6 Drastically different than the stand alone? Details: I have started my new position and have learned the new firm i work for has no administrator for Primavera. At this point the software is installed o...
I'm new to open plan and really don't know anything about it.I'm a Active Directory Adim, Systems admin.I've inherited this mess of Server Migration, which should have taken place years before I got here. All I have are these instructions below as to...
Hi All, How do I force the log off of users who no longer require their initial session open? How do look at the settings so I can see what P6 is automatically supposed to do? All help appreciated. Regards, Kylee.
Hello Every One,Can we assign same resource (e.g electircal technician) to differenct projects or withins same project at same time in primavera p6 r8.2.I am trying to manage my department resources on multiple projects, one resource not to assign m...
Hello Every One,Can we assign same resource (e.g electircal technician) to differenct projects or withins same project at same time in primavera p6 r8.2.I am trying to manage my department resources on multiple projects, one resource not to assign m...
http://3d-wbs.blogspot.fr/2013/09/part-94-why-to-structure-well-project.htmlDo you have others ideas?
Long time P3 user, was occassional now heavy P6 user. 3 things driving me crazy: 1). when I switch projects I always get the same default layout no what how I had left it, same with the filter. I want it to look like the last time I was in that fi...
[[wysiwyg_imageupload::]]My dear collegues, again, I would like to ask again for some guidance, I was trying to make an S-Curve to showprogress while in Resource Profile set up, then suddenly my P6.8.2 crashed, and when I load it up the followingshow...