Search

converted PowerProject programme mixed duration formats

Forum Topic

I have converted a Powerproject file to msp, however the duration & total float formats are mixed, ie some are "15 d" and some are "3 w". I cannot see where you can change them all to days?? Andrew

Aug 17, 2018

Piping activities

Forum Topic

Hello friends... Can anyone provide me the activity details of a gas field compression piping as urgent. I’ll be oblized to get any feed back regarding construction plan for a piping project. Any additional guidelines or job knowledge also will highl...

Aug 18, 2018

Preferred progress Measurement Technique

Forum Topic

Hello I would like to solicit advice on preferred progress Measurement technique in P6. Pros and cons of physical vs duration etc. Would it.make sense to build resources loaded schedule (labor non labor) if the duration is 15 months. Which method wou...

Aug 20, 2018

Resource loading challenge

Forum Topic

Here's the challenge...You have 10 activities in your schedule.  They are all resource loading (not necessarily the same resources).  They have a 'prioritisation' code allocated to determine the sequence of preference for resource levelling.  There a...

Aug 22, 2018

P6 R17 licenses

Forum Topic

Hello Planners,I cannot have an answer from Oracle-Primavera people; I hope (I know) that PPlanners will be more reactive!One customer of mine is willing to use P6 with 5 - 10 schedulers and 10 - 20 viewers (people who need to display P6 projects on ...

Aug 23, 2018

Baseline data linked to Activity ID

Forum Topic

It seems that Activity baseline data is connected to "task_code" when it used to be connected to "task_id" in the past.  That used to mean that you could change what we see as the "Activity ID" and P6 still kept the relevant baseline data (dates etc)...

Aug 23, 2018

Overall % Complete

Forum Topic

If my schedule is set to fixed units, how do I get it to show a overall percent complete?

Aug 23, 2018

Earned Value Help

Forum Topic

Can someone explain to me this situation :Is it possible to have  dropping  SPI for last 3 periods and the progress actual curve trailing on the slightly above late curve line? The forecast curve continues to show possible improvement starting from t...

Aug 24, 2018

Not copying across the A into Excel

Forum Topic

HiHopefully a quick easy questionsI'm copying across activities from P6 into Excel. However, for a couple of the activities, it's not copying across the A?I have tried different copy and paste options into excel, but no joy. Any ideas? RegardsPhilip

Aug 28, 2018

Schedule for constructing 50 Storage Tanks in a Refinery Project

Forum Topic

Dear Friends,We are in the proposal stage for 50 Storage Tanks in a refinery project. The diameter varies from 14 m to 49 m and with all combination of tank types (Fixed roof, Dome roof, Internal floating roof).Can anyone provide guidance in preparin...

Aug 30, 2018

WBS is not sorting correctly in Activities

Forum Topic

Time to ask a question to those who are smater than I am.I have my WBS structure completed correctly as per below[[wysiwyg_imageupload:6051:]]When I switch to activities my WBS order is changed with construction activities at the top and general cond...

Sep 1, 2018

Actual Cost and Remaining Cost Not Updating With Data Date

Forum Topic

Hello,I recently updated a construction programme of works after cost loading it. The cost is fixed (Lump Sum project) and the % Complete Type is set to duration. Thus, the calculate cost from units is not checked and a budgeted cost was allocated to...

Sep 3, 2018

Primavera P6 Error : AVAA0-1519-5

Forum Topic

Hi Everyone,I am facing a unique Event Code AVAA0-1519-5. I face this event code when I try to delete any activity or relationship in my schedule. And sometimes, I am unable to change the layout.In addition to this, I am unable to exit P6.We have Cit...

Sep 4, 2018

Cumulative budgeted resources

Forum Topic

Dear experts,In a project that I am currently associated with, our client had specifically insisted on using "Non-Labour" resources to be used as a progress measurement. They had issued a weightage for each WBS (Level-1) and requested us to report th...

Sep 4, 2018

Schedule Development - 91R-16 AACE

Forum Topic

Hello Everyone, Could you please guide me on the subject " 91R-16 AACE - Schedule Development" - AACE based. I found this as a requirement on a ITT (Instruction to Tenderers), but have no idea if there is something different in preparing the schedule...

Sep 5, 2018

Project Control Tolerance

Forum Topic

Hi All,how can i define the project control tolerance criteria for schedule, cost and quality? what is the base?best,moutaz

Dec 8, 2017

Forecast Start Date

Forum Topic

While performing status update is it advisable to adjus the start date of an activity (that has not started) if it does not align with the contractor date by means of adding a constraint or otherwise?

Dec 9, 2017