AS BUILT PROGRAM

Forum Topic

Hi, I need advice from experts. PROBLEM: Get an Approval of As Built Program SITUATION: Theres an Approved Program, however, the Client requested for As Built Program. My Managers gave the duration for each activity. The Client are not happy and cont...

Mar 4, 2012

testing with the schedule

Forum Topic

Hi everyone:I am new in the schedule world.  I would like to know if i can make a test with a subcontractor schedule and re-organize the activities and productions as i think that its gonna be the really subcontactor´s performance taking in considera...

Mar 4, 2012

Resources

Forum Topic

According to our contract with our client, We should not exceed 200 (men) resources at any given time. However when i extract information from Primavera to do my resource Histogram I get more than 200 (men) resources. If i get more than 200 (men) res...

Mar 5, 2012

Wembley Stadium Failure

Forum Topic

Hi All, Just a quick query - can anyone point to some literature or journals which discuss the nature of the project management of the Wembley National Stadium development?Regards,DC

Mar 5, 2012

Power Generation - Civil Construction of a Steam Turbine Table

Forum Topic

I recently told that there is a International Construction Norm for the Civil Construction of a Steam Turbine Table but I find that almost impossble to believe since the designs and constructability vary based on the size of the proposed Stator Unit....

Mar 5, 2012

P6 R8.2 EPPM Web Client - cannot Schedule or Summarize Project Data

Forum Topic

We have an installation of P6 R8.2 EPPM (for Web client) server on Microsoft Server 2008 with WebLogic 11g.  The Database installed is MS SQL Express 2005.  Java JDK 6 update 27 was selected during P6 setup.P6 installed and configured without errors ...

Mar 5, 2012

P6 R8.2 EPPM Web Client - cannot Schedule or Summarize Project Data

Forum Topic

We have an installation of P6 R8.2 EPPM (for Web client) server on Microsoft Server 2008 with WebLogic 11g.  The Database installed is MS SQL Express 2005.  Java JDK 6 update 27 was selected during P6 setup.P6 installed and configured without errors ...

Mar 5, 2012

Assigning a Material Resource in P6

Forum Topic

Hello All Planners.Please have a look at following example;I added a Material Resource Named "Crushed Aggregates" in my schedule.I have changed resource type to "Material" and adjusted the price per unit.No the unit of measure that i want to keep is ...

Mar 6, 2012

Updating in progress activities in Primavera Contractor.

Forum Topic

Updating in progress activities in Primavera Contractor.   is there an easy way to update in progress activities without having to trial and error a % complete. I just want to progress the works as planned.   I know there is the update progress optio...

Mar 6, 2012

Meeting calendar is causing negative total float

Forum Topic

I have milestones within my programmes which represent capital approvals meetings. These meetings are monthly so I have created a calendar for these milestones with only 1 working day per month. If the activities preceeding these milestones are late,...

Mar 6, 2012

CONTRACT MANAGEMENT EXPEDATION V "13"

Forum Topic

Dear all; kindly not that I face an error in expedition it come into view only when importing to excel the module of Corr. Sent; a window appeared as follows:   [[wysiwyg_imageupload:957:height=182,width=350]] load_error.png   Please feedback with th...

Mar 6, 2012

Reduce the negative total float

Forum Topic

Dear Scheduler...I have project 4000 activities and with TF = -117 in the current schedule NOT baseline, because we already late and behaind the schedule. My PM he want me to reduce the -ve TF before we submit it to the owner. So, any suggestions?Tha...

Mar 6, 2012

Volume of work lag in Forensic Analysis

Forum Topic

The AACEI RP 29R-03 2011 on the modeled substractive methods provide for extraction of entire activities or a portion of the as-built durations representing delays or changes from a network analysis model representing the as-built condition of the sc...

Mar 7, 2012

Different between Oil and Construction WBS parents......

Forum Topic

Dear Schedulers,As you know for the Construction project the WBS parents (level 2) should be as below then (level 3)...1-Milestones2- Pre-Construction 3- Design4- Procurement5- Construction6- Contract CloseoutSo, how it's going to be for the Oil and ...

Mar 7, 2012

Man Hour Efficiency

Forum Topic

Friends  Please help me in the term Man hour efficiency..Please let me know the formula if any body knows... RegardsArun V

Feb 7, 2012

How to get the rollup in WBS summary?

Forum Topic

Hi Friends,               Kindly help me in the issue of generating the rollup summary in the WBS for the UserDefined fields.   Thanks & Regards Suresh KJ

Feb 7, 2012