Qatar’s Guild Interest Group Meeting No 2 (Doha)

Event

Welcome to Qatar’s Guild Interest Group for the Guild of Project Planning, Controls & Delivery (GPPCD).[[wysiwyg_imageupload:375:]]We would like to invite you to the second small informal event to help planners meet, share knowledge and say hello.Whi...

Apr 1, 2011

exporting and importing project schedule

Forum Topic

why is it that everytime I export a project schedule, the original baseline and schedule % progress is missing when I try to import it using another computer? Any idea about this? thank you and very much appreciated.jhaymie007

Apr 2, 2011

Claim digger

Forum Topic

Hi I have problem with claim digger in P6. i cant c file savd by claim digger. somebody please tell me where it is saved. i cheked box near to "open after its sone". but its not opening? is it any installation problem?? i searched it in c drive/progr...

Apr 2, 2011

Claim digger

Forum Topic

Hi I have problem with claim digger in P6. i cant c file savd by claim digger. somebody please tell me where it is saved. i cheked box near to "open after its sone". but its not opening? is it any installation problem?? i searched it in c drive/progr...

Apr 2, 2011

Claim digger

Forum Topic

Hi I have problem with claim digger in P6. i cant c file savd by claim digger. somebody please tell me where it is saved. i cheked box near to "open after its sone". but its not opening? is it any installation problem?? i searched it in c drive/progr...

Apr 2, 2011

what is standard for creating any equipment house schedule

Forum Topic

Hi all    I want to create a schedule for compressor House  in which there is five same type of compressor, gear box, motor, silenser, mist eliminator, lub oil system, Motor cooling hydraulic system exist. according to me Process : 1. Craete PFD & PI...

Apr 2, 2011

Procurement schedule , procurement programme

Forum Topic

Hi,   I need to complete  procurement schedules / procurement programmes for refurbishment & extension projects. As the projects are fast track and and the design stage merges with the construction phase I  only have concept drawings for the projects...

Apr 2, 2011

Primavera 6.0 Event code CRRIP-3179-7

Forum Topic

When I import the schedule.xer from primavera P6, I recieved a message error:CRRIP-3179-7 - TCCurve.ReadRow: invalid percentage values. Anybody can help me.[[wysiwyg_imageupload:382:]]

Apr 3, 2011

Difference between WBS and Activity Codes

Forum Topic

Dear All, What are the advantages of having more WBS Levels in the project. with my previous project i was able to summarize the data wrt many categories by using the activity codes Like area/dept/phase.i had used only one level of WBS in the whole p...

Apr 4, 2011

Deletion of Provisional Sum ITem and giving it to another contractor

Forum Topic

Dear Friendsi am working in UAE on a construction project , our contract is lump sump project . There are some items in the BOQ under the heading of provisional sum , there are simple concrete jobs whose rate can be taken from main BOQ , however the ...

Apr 4, 2011

p6v7 - help reporting progress against resources

Forum Topic

i have just moved from using p3 to p6v7, its pretty different and i'm really missing the way p3 would calculate in reports!  anyway, thats irrelevant now and I need to report daily progress against my schedule, based on resources.    my schedule is s...

Apr 4, 2011

How can i refelect the no of deliverable in Primavera

Forum Topic

Hi all   I am preparing an engineering Schedule. in which suppose any activty such Detail drawing of Compressor will contain 20 A1 size drawing. How can i refelect this in schedule. ACTIVITY      Duration            Resource                    No Of ...

Apr 5, 2011

How to start as a planner

Forum Topic

Dear all ,                Iam Nadeem I hve total 3 yrs experience as a Civil Engineer i hve decided to concentrate my future in planning , can anyone suggest me as hw 2 proceed to become a successful Planning Engineer. Pl if anyone of u folks have  o...

Apr 5, 2011

Recources loading report CSV

Forum Topic

Dear friends,When I try to exoprt recources loading report on CSV format, I can aopen it on Excel but all infomation on only one culumn, so I can't generate ressources histograme! Is there any solution for this probleme? Thank you in advance.

Apr 5, 2011

Steel Construction

Forum Topic

Hi guys! can I ask your helpfull hands & minds? I'll be dealing with a schedule for a steel structure, can anyone advise me on the sequence of acitivities for such project? What about for aircraft hangars program? Its my first time to make a schedule...