Production rates for Indonesia Construction
Forum TopicDear All May I request for Production rates for INDONESIA construction industry.Rebar fabrication and Installation as one of my concerns. Thanks mate, eddy
Dear All May I request for Production rates for INDONESIA construction industry.Rebar fabrication and Installation as one of my concerns. Thanks mate, eddy
I am trying to automatically create several hammocks whose start will be defined by early use of a given resource and its finish will be determined by the late finish of the resourceuse by its predecessors SS/FF. The resource FM1 TO FM10 will be allo...
Hello, What is the Resource Leveling in construction management and how it can be applied by using P6 Regards
Here are some of the things that you can do without having to resort to asking your team to simply work longer hours http://ow.ly/4neJF9
Just downloaded the trial version of Asta to see what all the fuss is about. I am finding it really frustrating. Can anyone help?Every time I create a new project it always starts with an 18 week lead in. Why? I don't want an 18 week lead in. I just ...
Can someone provide me the Budgeted manhours for Electrical and Instrumentation Activities ormanhours for substation and cable laying works.
Dear,My company usually use Microsoft Project and P6 to prepare programme. How could I export these prepared programme to Asta Powerproject? Regards, Gary Lo
I am using version 8.3.2 and can't seem to find the "responsibility" option to assign responsibility to different activities. I had previously been using a later version of P6 at previous employer and remembered using "RESP" and having it shown in my...
Has anybody had any experience with a typical glass balustrading and assosiated hand rail system installation. I need an average output for its installation, e.g. (50m). Also how many men make up the installation gang,Many thanks,Elliot
Hello Everyone,I am a Project Control Engineer ( planning, Cost control and claim). Luckly i got to learn all this in 8 years.I would like to know what course should i do to get a certification. Is PMP enough (I dont have that) or is there a specifi...
Dear Professionals,How to develop a revised baseline schedule using last update? I need to do the following:1. Need to, prepare the revised baseline schedule, by taking as-built data of last updated schedule.2. Need, Planned Value (PV) of revised sch...
Can anybody advice if there is any code or standard mention the contain of the claim submission by the contractor, and can I instruct the contractor as an engineer for the project to use a specified way of analyzing the claim such as window analysis...
Hi All,I was wondering if anyone could help. I’m currently looking for a software developer who’s got strong background working with SDK kit in P6.If any of you guys can point me into the right direction this would be much appreciated.RegardsTom
Hi All,I was wondering if anyone could help. I’m currently looking for a software developer who’s got strong background working with SDK kit in P6.If any of you guys can point me into the right direction this would be much appreciated.RegardsTom
Hi,I am trying to figure out what will be the best way to show plan when I have constraints on accessing the building to perform installation of items.For example, I need to access the dates between 1 Dec and 31 Dec, but my parts won't arrive until 1...
Hi All,I was wondering if anyone could help. I’m currently looking for a software developer who’s got strong background working with SDK kit in P6.If any of you guys can point me into the right direction this would be much appreciated.RegardsTom
I am planning for PSP certification. Would you like to suggest me study material to pass PSP exam. I have started my preparation from construction projects Scheduling and control-3rd edition Saleh Mubarak and PSP Study Guide. Is this book enough or i...
Dear All,I am facing problems updating the schedule through import command "Update Existing Project". Whenever i update my schedule, it duplicates resources by adding it in the resources thus doubling the budgeted total cost.Kindly suggest.Rizwan Rau...
Dear all Can any one please tell me what i can study exactly for the PMI-SP exam ? I took the course but i have lack of materials some people said that i have also to stufy the pmbook 5th but what exactly and if anyone have any exam samples i will be...
HiEveryso often i have to convert programmes from P6 to Candy and vice versa. These tow sets of software dislike each other and this does not seem to work directly with the newest versions of both software. The only way i can make it work is to go vi...