Synchro Support

Forum Topic

Have you seen our new website? http://synchroltd.comWe have an updated support section on our website with specific forum sections for your support questions.We monitor our website daily, and planningplanet less frequently. So, for any support querie...

Oct 14, 2013

Inputting disruption dates

Forum Topic

 Hi All I’m working on a power station project, and have to input the disruption dates of the “strike action” into my program. Could someone advise me on how I can show these disruption dates through the entire schedule. I have 4 sets of dates to inp...

Oct 14, 2013

Issues with sorting by multiple Code Libraries

Forum Topic

Hello all,I’m experimenting with schedules solely based on Code Libraries where tasks are defined by Code Libraries such as Activity Type, Objects and (Construction) Phases, instead of describing a task in the ‘description’ column. I’m investigating ...

Oct 14, 2013

Actuals

Forum Topic

hi every body, i want to ask something concerning actuals. Does any body here update actual cost for activiites with real cost , not the earned value ? we do this for WBS level on Excel sheet in order to implement EVA. i think it will take a big effo...

Oct 14, 2013

PM.exe command line actions

Forum Topic

I found this interesting article explaining how to do imports using PM.exe in command line: http://delayanalysis.blogspot.com/2013/01/what-is-problem-generally-speaking-p6.htmlIs there a list of all actions that can be done using this method? I suppo...

Oct 14, 2013

Industry Best Practise

Forum Topic

Can anyone point me in the direction of a document that details out "Industry Best Practise" when it comes to Planning, in particular, cost loading of schedules? The contract that I'm currently working on uses this term, but we have been challenged o...

Oct 15, 2013

Rolling Wave Scheduling

Forum Topic

Hi All I have to give a presentation next month on rolling wave scheduling, does anybody have any good resources to read or research a rolling wave schedule? Best Pat

Oct 16, 2013

Export to XER

Forum Topic

Hi everyone,I am working on a schedule on Primavera P6 V.8.2 with web based access. I need to email my schedule to someone, and I was thinking of exporting it to .XER and send the .XER by email. But it seems that there is no way to export it to.XER.I...

Oct 17, 2013

Fatal error message “save operation failed”

Forum Topic

Been seeing this message more and more lately, now I can only save a file once after opening before this appears on the second time of saving. When close down and re open the software I do not have the recovery option. Have also tried Save As but thi...

Oct 17, 2013

100% Activity Late Finish different from Actual Finish

Forum Topic

I've been asked to review a Contractor's P6 Schedule - Only a hard copy is available at this time.There are several activties that are 100% complete with the Actual Start & Finish dates noted, none of the dates have constraints.  Since the activity h...

Oct 17, 2013

Job-Costing procedure for Construction

Forum Topic

Dear all experts, and Mr RafaelI am very interested in this procedure to control cost, productivity for our projects (offshore platforms, jackup rigs). Can you share the material, etc related to job costing system.The differences between CBS (focused...

Oct 18, 2013

Making Sense of Schedule Risk Analysis

Forum Topic

Mosaic Project Services is supporting a presentation by Tony Welsh, President, Barbecana Inc on the 20th November in Melbourne, Australia. The evening is free and all Planning Planet members are welcome - for more information see the related blog: ht...

Oct 20, 2013

Microsoft Project Enterprise Edition

Forum Topic

Can i assign more than one coding to an activity in MSP, to enable me to view a filtered view for more than one field that the activity may fall under.For example if i were to code an MCC installation as "Electrical works", would i be able to create ...

Oct 21, 2013

Contractors Impacted As Planned

Forum Topic

Hi All, Seeking some advice with regards to an EOT that has been submitted by a Contractor. The Contractor has impacted the Baseline schedule with employer culpable events to demonstrate his entitlement to an extension of time. By impacting the basel...

Oct 22, 2013

Find new Activities

Forum Topic

hi, I'm new to Primavera so still finding my around the software.I've got a problem at the moment, the plan I'm working on is required to be seen by a lot of people, all with the same access rights, and for some reason somebody has added a few activi...

Oct 22, 2013

Using UDFs in formula

Forum Topic

When I try to use a UDF for consumable/permanent resource in the formula , I get an error message saying - "The formula refers to a UDF or UDT that does not exist . ." in the status bar of the formula dailog.But the UDF exists and I am able to enter ...

Oct 22, 2013

A few simple questions

Forum Topic

Hi,Have a few questions I would like someone to answer if possible?Q1. When planning fit-out periods how is this usually done as it doesnt really follow a finish-to-start relationship or am I doing it wrong. I usually have 1st fix joinery, 1st fix M&...

Oct 22, 2013

Finish baseline variance not showing any number

Forum Topic

Hi All, I am trying to see what the finish baseline variance and finish last period variance is but the columns don't show any number or figure. Do i need to modify after selecting them? Can someone please help? Regards, Patrick

Oct 23, 2013