Microsoft Project Enterprise Edition

L
Liam Darcy 👤 Member for 22 years 6 months

Can i assign more than one coding to an activity in MSP, to enable me to view a filtered view for more than one field that the activity may fall under.

For example if i were to code an MCC installation as "Electrical works", would i be able to create another code library and assign a code to that same activity to filter all works for "Smiths Electrical" to see a filtered view of all the works done by Smiths?

 

Thanks in advance,

Featured Partner

Top Posters

Zine Eddine
2 posts
Alex Lyaschenko
27 posts
mxsiegel
0 posts
Mattvtek
0 posts
Gareth Evans
3 posts
PP Admin
3, 129 posts
Rajkamal Tangirala
5 posts
Rahul Kumar
1 posts
blake333_
0 posts
Jeamiell Ostrovsky
2 posts