Phase Value roll-up

Forum Topic

Why in order to get the correct phase values roll-up, when Phase value is the sum of activity values, I must click F8 after formula execution? I was expecting for the value be computed automatically whenever a value is changed no matter if manual or ...

Aug 18, 2011

PowerProject link to Excel

Forum Topic

Hi,   Is it possible to link PowerProject (v10/v11) to Excel, whether this is via VBA or an external 'middle' programme, if so is there some api's we can use? Thanks

Aug 19, 2011

Activity Usage Profile - Hour by Hour

Forum Topic

Hello All,Is it possible to get an hour by hour resource distribuition in P6 ? I have prepared a shutdown programme which is resourced at an activity level but when I switch to activity / resource usage profile it seems to accumulate effort / unit on...

Aug 19, 2011

p3 durations

Forum Topic

i have created a p3 schedule with 250 activities the schedule is currently set to duration in days the problem is there are 3 times during the project where a shutdown must occur and you have a 6 hour max window to complete all tasks so our activitie...

Aug 19, 2011

EV Cost and Schedule Indicators

Forum Topic

Hi, I have developed a schedule that is resource loaded with cost entered for the standard rates per hour for the respective resource. It is baseline,tracked and updated to date. In the calculation tab along with the task information for EV calculati...

Aug 19, 2011

Weekend puzzle -Lateral thinking word games

Forum Topic

Can you name these 9 words or phrases?   You may find these a bit difficult if english is not your native language.     [[wysiwyg_imageupload:634:]]

Aug 19, 2011

P6V7 Project Acess Mode - Please help

Forum Topic

Hi,   I need you help please..   I am using P6v7, Stand Alone Version.  1. I cannot  access my project on an exclusive mode... although I have "Superuser" profile/Privilage. I cannot open the project on an exclusive mode:   File>Open>Project (exclusi...

Aug 19, 2011

P6V7 Project Acess Mode - Please help

Forum Topic

Hi, I need you help please..   I am using P6v7, Stand Alone Version.   1: I cannot access my project on an exclusive mode... although I have "Superuser" profile/Privilage. I cannot open the project on an exclusive mode: File>Open>Project (exclusive m...

Aug 19, 2011

Project Resource Analysis

Forum Topic

Hi Everyone, I am about to start a position that focuses on project resource analysis.  I have a lot of project management experience, but never specified in project resource analysis.  Can anyone recommend some resources or topics I should go over? ...

Aug 19, 2011

problem with percent complete

Forum Topic

Dear all,I am using Ms project 2007.Physical percent complete progress  bar not showing correctly.And also I want to show progress line based on physical percent complete.is it possible.When I try this progress line showing based on % complete not Ph...

Aug 20, 2011

Visualisation of resource availability

Forum Topic

Dear Forum,  I want to build a layout where I have:  for example two persons - person A and person B who are available on rotational basis(when Person A is in country, person B is out of country) and their availability to be shown o[[wysiwyg_imageupl...

Aug 20, 2011

Visualisation of resource availability

Forum Topic

Dear Forum,  I want to build a layout where I have:  for example two persons - person A and person B who are available on rotational basis(when Person A is in country, person B is out of country) and their availability to be shown o[[wysiwyg_imageupl...

Aug 20, 2011

Overwriting in P3

Forum Topic

Hello, Please what is the right thing to do when you extract a PRX file in a folder that already contains P3 files, The prog ask u if you want ti overwite ir not.   Cheers K

Oct 14, 2010

In what order do replies display?

Forum Topic

Hello PPs and administrators,I feel "very" disturbed in the new forum when I browse the replies to a specific topic; why are the replies not sorted in last to first order as before and on most forums?Thanks for your answer,Alexandre

Oct 14, 2010

Excavate and Remove

Wiki Page

 Excavate and RemoveTask / DescriptionSlow  Ave  Fast   Units Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil14.5 20.0 25.6  m3/hr Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds15.2 20.4 25.6  m3/hr Excavate Spoil Heaps to Tr...

Oct 14, 2010

MSP - P6

Forum Topic

I convert my MSP Programme to P6 ........ But once i come to modify the date in the converted the finish doesnt work.

Oct 15, 2010

Monitoring of Works on Linear Projects

Forum Topic

When monitoring specific elements of work on huge linear projects what is the best way to monitor progress in multiple location at the same time when time does not permit regular site visits?

Oct 15, 2010

Measure Daily Productivity

Forum Topic

Hello How do we measure daily productivity for Steel Fixing ......?  Best RegardsShareef A Azeez

Oct 15, 2010

How to code activities in Microsoft Project

Forum Topic

Hi Everyone, How can i code activities in Microsoft project, so I can assign diffrent color codes or shapes to the coded activity.I appreciate everyones help.Thanks in advance.Kind Regards,Kinnar Patel

Oct 15, 2010

Schedule analysis & Time impact analysis

Forum Topic

I have read somewhere about schedule analysis & Time impact analysis.Can anyone explain what are those and How & when to perform them on a schedule and  advantages of  them.

Oct 17, 2010