Late units & Early units

Forum Topic

Hi,I have been posted to another project site and that is supposed to finish by 31 Dec this year. And have some strange result of man-hour report in the programme. The Remaining Late Units man-hors finishing 19 weeks (Nov 2016) earlier then the Remai...

Aug 24, 2015

Late units & Early units

Forum Topic

Hi,I have been posted to another project site and that is supposed to finish by 31 Dec this year. And have some strange result of man-hour report in the programme. The Remaining Late Units man-hors finishing 19 weeks (Nov 2016) earlier then the Remai...

Aug 24, 2015

Is there a shortcut way of entering progress on ASTA?

Forum Topic

Hello everyone, I was wondering if there was a shortcut way of entering progress into ASTA activities.I know that you can select the little box on the bottom corner and also use the mouse to drag percentage on the actual bar.However I was wondering i...

Aug 24, 2015

PMSDK: Connecting via standalone VB script (Visual Studio)

Forum Topic

Hi all,I have looked at previous related topics and they have got me as far as the (hopefully last) hurdle. I get an error when my VB script tries to access the database through PMSDK. My setup is as follows;I am running a standalone install of P6 Pr...

Aug 24, 2015

How to schedule a resource to switch from a job to another

Forum Topic

Hello,I'm schedulling an engineering job, MEP.the plan for mechanical as follows:there are 3 desginers, each will take a division - pluming 1 engineer, HVAC 1 engineer, and FF 1 engineer.each have a drawing list with assigned hours for each drawing, ...

Aug 26, 2015

Group & Sort - WBS ???

Forum Topic

Hello.I am hoping there is a sorting solution that someone can help me with.Can the WBS be sorted by Start Date? I'm in the Planning Stage of a project that has 11 buildings. If I change sequencing, Building 8 might be the 1st one being worked on, bu...

Aug 26, 2015

Problem with Primavera P6 version 8.3.2

Forum Topic

Dear all,I am using P6 version 8.3.2. I loaded one non-labour unit as weight factor for activities. Activity types are fixed duration and unit. After a few updates, now I see in my schedule, all the non-labour units assignment has changed which means...

Aug 26, 2015

Help Required - How to actualise several activities at once

Forum Topic

Morning all,I wonder if somenoe can tell me a quick way to actualise several activities at once in P6?I am working on a programme that has several structures within it each with their own WBS section, however a couple of the structures have been remo...

Aug 27, 2015

PRA Cost Roll Up

Forum Topic

Hi,In the Risk Outputs tab of PRA, the P50 cost does not seem to roll up properly. For example the sum of the P50 costs of activities do not always equal the P50 cost of their WBS element, and the sum of the P50 costs of WBS elements does not always ...

Aug 27, 2015

Can you create codes in the Library Explorer to remain permanent?

Forum Topic

Hello everyone,At the moment when I create a programme I create codes so that I can apply it to the bars.However when I open a new project it seems that those codes dont come up in my "project view"They re appear when I open up the project that I cre...

Aug 27, 2015

MSP 2013 - Filters for 3wk and 12wk lookahead

Forum Topic

Morning All, I am trying to create  layout/filter in MSP 2013 for a 3wk and 12wk lookahead. I dont seem to be able to use the easy logic for creating the same rules that i use in P6 in MSP. Typically I would us CD (Current Day) +/- period of time (in...

Aug 28, 2015

It has been an interesting week for my family.

Forum Topic

Hi AllThis week has been interesting:My grandson has a job as a deck hand on a small drift trawler in the North sea. On Tuesday it sprung a leak and he had to keep bailing while the skipper rushed to the beach.On Thursday my grand daughter was accept...

Aug 29, 2015

Filter projects in EPS by milestone status

Forum Topic

I (as well as my company) am new to running P6, and have what should be a basic question.  I have searched the internet and have come up empty.  What I want to know is if I can filter projects in the EPS window based on milestone status.  Now I know ...

Aug 31, 2015

How to reschedule??

Forum Topic

Intially the project finish date was 30April 2016, Because of the Penalty milestone, dates have been prepon to Dec 2015..so how to fix this in p6???

Aug 31, 2015

Updating Problem

Forum Topic

Dear all, I want to be updating percentage comple so I rename the "Performance %Complete Colum" as , but when I try to enter a value, it only display 6%, no matter the value it will display 6%.Please help solve this problemThanks

Aug 31, 2015