Search

DCMA 14-Point Schedule Assessment

Blog

Referred article on DCMA 14 Metrics, from Deltek website, regarding DCMA 14-Point Schedule Assessment: https://help.deltek.com/Product/Acumen/8.6/GA/DCMA%2014%20Point%20Assessment%20Metric%20Descriptions.html

Jul 9, 2021

Australian Dept. Defence Support for PGCS 2021

Forum Topic

The Department of Defence, and particularly CASG have been involved in the development of PGCS since its inception in 2013. This year is no different with a powerful line up of speakers in the Defence Stream, and special access to the Symposium detai...

Jul 13, 2021

Post ID number

Forum Topic

Post ID/comment number is not fixed but every time a new post is creater the number 1 is re-assigned to last entry.This makes it hard/impossible to make reference to a prior post using a simple ID number.It wold be better if the post number at the to...

Jul 13, 2021

Rate Change in P6

Forum Topic

There was a rate change on my schedule. All ended activities accepted the changes without any issue same with all future activities without actual. My problem is that all Activities that are in progress and exceeded the current data date are still re...

Jul 13, 2021

Bulk New Project creation tool? or SQL function?

Forum Topic

Hello All, I have recieved an excel spreadsheet that contains about 500 rows and 8 columns.The columns are:Project IdProject Nameand 6 other columns that match our Project Code directory. My question is, do you know of a way that this spreadsheet can...

Jul 15, 2021

Saw Cutting Concrete Basement Slab Rate

Forum Topic

GuysIm looking to saw cut some drainage in an existing basement. The slab is 400mm & im putting in around 120 LM of drainage in various runs & 3 pcc manholes. What I need is a rate to cut the slab using a saw cutter. Any help appreciated Andrew

Jul 15, 2021

projected NTP and contractual dates vs actual start

Forum Topic

If a contract uses NTP and Substantial Completion dates in the bid documents, and the NTP starts significantly after, such as 50 days.  What would you call simply sliding the timeframe.  It should not require a change order because the odds of starti...

Jul 23, 2021

Draw all S-Curves & Cash Flow of Primavera Projects in one step.

Forum Topic

See this Video to learn about how you can use the SDK Magic Tool to draw tens of S-Curves for your Primavera Projects in just few minutes.1- Main Curves BCWP, BCWS and ACWP are included in one step.2- You can draw 40 S-Curves for costs.3- You can dra...

Jul 25, 2021

MSP Export file

Forum Topic

Whilst I have imported MSP files many times I have only ever exported P6 to MSP once several years ago. Running 17.12.8, the PM has asked for an MSP export file but he can't open an mpx which I gather is for old versions of MSP. Everytime I try to ex...

Jul 27, 2021

P6 EPPM v20.12 LOE actual labor units not populating

Forum Topic

Hello,My project management level of effort (LOE) activity has progressed Duration % Complete 7.89%, but the actual labor units of the assigned labor resource is not populating. I tried the below:1) Actions | Recalculate assignment costs.2) Schedule ...

Jul 30, 2021

P6 Feature: Notebooks

Forum Topic

Tensix has a good article on a feature in P6 that is oftentimes taken for granted but is actually an important aspect of using the software whether for record-keeping, forensics, analysis, or facilitating project teams for schedule development and up...

Jul 30, 2021

Busy, But Not Productive

Blog

Everyone tells me they are busy.  They are on video or conference calls from morning until evening.  On average, workers receive over 100 emails per day and send at least 40.   A common complaint is, “I spend my entire day meeting and doing email; an...

Aug 3, 2021

How to use Lumpsum cost in Primavera P6 to generate S-curves data

Blog

When it comes to generating Primavera P6 data for use in Excel to plot progress s-curves, the recommended practice is to use Resources as basis for progress measurement in P6, but there are times when it is not possible to use Resources either becaus...

Aug 4, 2021

Set Fiscal Start

Forum Topic

Hi All, I am running P6 20. Standalone. How do I set the Fiscal Period to Start in July 1st? Thanks, Rod

Aug 11, 2021

how to do the Mega/Complex project structure

Forum Topic

I have a question on how to setup the Mega/Complex project structure.the project cost is more than $1 billion, the execution team come from more than 4 region, each region has at least 2 teams. all the team member should charge hours, and their charg...

Aug 14, 2021

CAREER GROWTH FOR A PLANNING & PROJECT CONTROL PROFESSIONAL

Forum Topic

I am a planning and project control professional with 15 years of post qualification experience. So far what my understanding is that career growth opportunity in project management functional domain is quite high and like my fellow professionals I a...

Aug 14, 2021

Is there a rule to measure ratio : Qty of Task / Qty of links

Forum Topic

Hi everybody,Do you know if there is a specific rule / code / good practice to measure folowing ratio : Qty of Task / Qty of links ?I know that DCMA proposes to check 14 points throught schedule, and the closer one to check the logic. But this doesn'...

Aug 18, 2021

IMP integrated Master Plan

Forum Topic

Anyone interested in the format for an Integrated Master Plan  for entrepreneurs and USA Federal Contractors

Aug 19, 2021

On Same Data Date Actual Units Doesn't Equal Cum AtCompletion Units

Forum Topic

Hi All,Once a week, i update and schedule my P6. This week I noticed that some of activities' Total Actual Units doesnt Equal for the same week Cum At Completion Labor Units.In my case they all should be the same, I think (Because my Budgeted Labor U...

Aug 24, 2021