Bulk New Project creation tool? or SQL function?

Hello All,

 

I have recieved an excel spreadsheet that contains about 500 rows and 8 columns.

The columns are:

Project Id

Project Name

and 6 other columns that match our Project Code directory.

 

My question is, do you know of a way that this spreadsheet can be used to create new projects in bulk?

 

Regards,

 

Rod

R
Rodney Jones 👤 Member for 13 years 11 months

Rodel, Zoltan,

 

Thank you both for the assistance. I had to install Office 365 32 bit version to get the Parser file running. All working as described now.

 

Much Appreciated.

 

Rod

R
Rodney Jones 👤 Member for 13 years 11 months

Hi Zoltan,

 

Tyhanks for the file but I can't get it to run either, I am using Office 365, do I need an earlier version of Excel to have this working without errors?

 

Rod

R
Rodney Jones 👤 Member for 13 years 11 months

Hi Zoltan,

 

Would you please email those parser instructions? I can't get it to run, just errors of not finding file.

 

Rod

R
Rodney Jones 👤 Member for 13 years 11 months

Hi Zoltan,

 

Than picture hasn't come through properly so please email me. 

Z
Zoltan Palffy 👤 Member for 16 years 10 months

here are the instructions

not sure why so smal but if u give me your email address I can send the word file

[[wysiwyg_imageupload:7833:]]

R
Rodel Marasigan 👤 Member for 19 years 7 months

Hi Rod,

The purpose of creating 2 or 3 Project in P6 is to have sample data to see or review so you can familiarize on the data that will be exported to xer and excel by xerFileParser. Once you get the idea, you can just copy and paste the project id and project description on the correct field and populate the other fields. Let me know if there is any issues.

R
Rodney Jones 👤 Member for 13 years 11 months

Hi Rodel,

 

Great, I will download it from that link.

Just to clarify, I want to auto-create projects without having to first create them in P6. I will be bringing approx 1,000 projects in. Here is a screen snip and attached is a sample spreadsheet with only 200 rows, but you get the idea.

(Hmmm, I can't insert the spreadsheet)

Zoltan, I have not included the other 6 columns as I am not concerned about them at the moment but they are columns that are mapped to some specific Project Codes that we have created.

 

 

Project Project Name
P.0005151 HW7 East Sprayed Sealing
P.0005293 Behavioural Speed
P.0005328 Facilities around schools - Reactive
P.0005352 HW7 West Sprayed Sealing
P.0005353 HW6 Sprayed Sealing
P.0005354 HW8 Sprayed Sealing
P.0005355 HW11 Sprayed Sealing
P.0005356 HW12 Sprayed Sealing
P.0005357 HW18 Sprayed Sealing
P.0005358 HW21 Sprayed Sealing
P.0005359 HW22 Sprayed Sealing
P.0005360 HW27 Sprayed Sealing
P.0005382 HW29 Sprayed Sealing
P.0005383 MR54 Sprayed Sealing
P.0005384 MR56 Sprayed Sealing
P.0005385 MR61 Sprayed Sealing
P.0005386 MR70 Sprayed Sealing
P.0005387 MR78 Sprayed Sealing
P.0005388 MR245 Sprayed Sealing
P.0005389 MR253 Sprayed Sealing
P.0005390 MR310 Sprayed Sealing
P.0005391 MR334 Sprayed Sealing
P.0005392 MR359 Sprayed Sealing
P.0005393 MR377 Sprayed Sealing
P.0005394 MR410 Sprayed Sealing
P.0005395 MR421 Sprayed Sealing
P.0005396 MR516 Sprayed Sealing
P.0005397 MR558 Sprayed Sealing
P.0005398 MR559 Sprayed Sealing
P.0005399 Reg Roads Broken Hill WC Sprayed Sealing
P.0005401 HW17 MB3 Asphalt Resheeting
P.0005412 HW5 Asphalt Resheeting
P.0005413 HW7 East Asphalt Resheeting
P.0005547 Reg Rds Block Grant Mid Western Regional
P.0005548 Reg Rds Block Grant Bathurst Regional
P.0005558 BalItem 21110 Passing Lanes OW
P.0005661 HW17 Mogriguy Rehab
P.0005682 HW5 Kirconnel Reconstruction
P.0005800 Reg Rds Block Grant Warrumbungle Ccl
P.0005856 BalItem 222021 Bridge Rebuilding OW
P.0005987 BalItem 22114 Concrete Pavemt Rehab OW
P.0006018 BalItem 21301 Flood Mitigation OW
P.0006044 HW7 B4148 LH Ford Bdge Midspan
P.0006059 BalItem 21106 Sealed Road Extension OW
P.0006118 HW7 East Heavy Patching Auslink
P.0006120 HW7 West Heavy Patch State
P.0006210 HW18 Back Creek Road Widening
P.0006276 HW18 Blackmans Flat Widen & Reshape
P.0006281 HW17 Marsden Rehab
P.0006406 HW5 Orange Road Services Culvert Repairs
P.0006586 HW17 MB2 Heavy Patch Auslink
P.0006588 HW17 MB3 Heavy Patch Auslink
P.0006590 HW17 North Marsden Causeways
P.0006627 HW8 B9239 Unnamed Creek
P.0006677 HW8 Musheroo Widening
P.0006694 LGRSO MOREE Projects
P.0006695 LGRSO ORANGE Projects
P.0006696 LGRSO DUBBO REGIONAL Projects
P.0006698 LGRSO BATHURST Projects
P.0006699 LGRSO MOREE Salary
P.0006700 LGRSO ORANGE Salary
P.0006701 LGRSO DUBBO REGIONAL Salary
P.0006826 MR633 Sprayed Sealing
P.0006827 MR633 Pavement Heavy Patch State
P.0006903 LGRSO BATHURST Salary
P.0006904 LGRSO PARKES Projects
P.0006905 LGRSO PARKES Salary
P.0006906 OCCUPANT RESTRAINT
P.0006907 Reactive Speed Zone Reviews
P.0006967 BalItem 22201 Bridge Routine & Minor OW
P.0007113 HW27 B4409 Plain Creek 22.12km NE Dubbo
P.0007161 HW27 B4405 Ballimore Ck 33.84km NE Dubbo
P.0007182 HW27 B4402 Spicers Ck 41.03km NE Dubbo
P.0007222 B4B LR2580005 B1302 McKanes Bridge CoxsR
P.0007335 HW5 B1036 Marrangaroo
P.0007421 Reg Rds Block Grant Forbes Ccl
P.0007436 Reg Rds Block Grant Gilgandra Ccl
P.0007463 Reg Rds Block Grant Lachlan Ccl
P.0007468 Reg Rds Block Grant Narromine Ccl
P.0007483 Reg Rds Block Grant Parkes Ccl
P.0007488 Reg Rds Block Grant Walgett Ccl
P.0007505 Reg Rds Block Grant Warren Ccl
P.0007508 Reg Rds Block Grant Weddin Ccl
P.0007584 Reg Rds Block Grant Lithgow Ccl
P.0007591 Reg Rds Block Grant Oberon Ccl
P.0007709 Reg Rds Block Grant Broken Hill Ccl
P.0007734 Reg Rds Block Grant Central Darling Ccl
P.0007766 Reg Rds Block Grant Blayney Ccl
P.0007773 Reg Rds Block Grant Bogan Ccl
P.0007776 Reg Rds Block Grant Bourke Ccl
P.0007780 Reg Rds Block Grant Brewarrina Ccl
P.0007803 Reg Rds Block Grant Cabonne Ccl
P.0007810 Reg Rds Block Grant Cobar Ccl
P.0007826 Reg Rds Block Grant Coonamble Ccl
P.0007830 Reg Rds Block Grant Cowra Ccl
P.0007924 HW5 Meadow Flat Stabilise Orange RS
P.0008201 HW12 Browns Creek Widening
P.0008245 MOTORCYCLE SAFETY EDUCATION - WESTERN
P.0008300 HW17 North Croppa Creek Rehab
P.0008315 BalItem 22104 Flexible Pavement Patch OW
P.0008335 HW17 North Gurley Foam Stabilisation
P.0008395 Reg Rds Block Grant Narrabri Ccl
P.0008411 Reg Rds Block Grant Moree Plains Ccl
P.0008724 BalItem 22303 Slope & Retaining Wall OW
P.0008725 HW28 Carnarvon Highway Rehabilitation Ca
P.0009004 HW18 North Coonamble Rehab
P.0009035 MR54 Perthville Rehab Bathurst Ccl
P.0009052 MR253 O'Connell Rehab
P.0009122 B4B LR157002 B4658 Warroo Bridge Replace
P.0009272 HW17 MB2 Sprayed Sealing
P.0009274 HW17 MB3 Sprayed Sealing
P.0009275 HW5 Sprayed Sealing
P.0009332 HW17 Mardell Cracked Reshape
P.0009444 BalItem 22304 Drainage Rehabilitation OW
P.0009511 HW7 B4123 Bridge Molong Ck Larriss Lea
P.0009540 Reg Rds Block Grant Orange Ccl
P.0009634 BalItem 22323 Slope Retain Wall Cap OW
P.0009636 BalItem 22001 Routine Maintenance OW
P.0009709 OLD-HW22 Waratta Ck Int Seal DONT USE!
P.0009712 HW22 EightMile Ck Intl Seal Far West RMD
R
Rodel Marasigan 👤 Member for 19 years 7 months

Hi Rod,

You can download it from the internet. There also some tutorial on how to use it. See below link.

https://cdn.planacademy.com/wp-content/uploads/2012/01/xerFileParserBuilder_2007.xlsm

The best way of doing it is by creating 2 to 3 Projects in P6 including the Project Code so you will be familiar with the data. Open all the 3 projects created (Just place holder and NO WBS , NO Activities) and export it to XER. Open the xer with the XERFileParserBuilder and fill the the project data and project code. I assumed you are familiar with P6 database field to understand the heading of the XER table. Should you have any issue, let me know. If you can share the spreadsheet, I can build the xer for you.

Z
Zoltan Palffy 👤 Member for 16 years 10 months

can you share the spreadsheet or a pic of it. Some fields are importable into primavera and some are not. 

R
Rodney Jones 👤 Member for 13 years 11 months

Hi Rodel,

 

Yes, I just want the placeholder/shell created because then I will copy my template wbs into them. What is this tool you speak of?

 

Thanks,

 

Rod

R
Rodel Marasigan 👤 Member for 19 years 7 months

Hi Rodney,

Do you mean adding those project into P6 Database without WBS and Activities?

If you are familiar with xerFileParserBuilder you can build XER with all the project in one XER and import to P6.

Forum Sponsor

Top Posters

Julian Pegg
1 posts
Peter Nagy
2 posts
Raymund de Laza
17 posts
Syed_Asad
0 posts
Tony Greyvenstein
0 posts
Ahmed Al-Jubouri
13 posts
Umar Alvi
3 posts
Sibusiso Mahlalela
0 posts
Michael Samanyayi
3 posts
Simon Gumede
0 posts