Search

Contemporaneous and Forensic Time Impact Analysis

Forum Topic

hello expertsI'm confused about differences between "Contemporaneous Time Impact Analysis" and "Forensic Time Impact Analysis". can anyone explain me what are the differences between these two topic?

Apr 17, 2018

Baseline versus Actual Schedule Duration Complete Comparison

Forum Topic

Hello,I need to compare Baseline Duration %Complete versus Actual Duration % Complete. I know that I can see this with "Schedule % Complete" column at activity level, not WBS Level. Schedule % Complete uses EV data for WBS. But what I need is to comp...

Apr 18, 2018

Change Order Impact Study

Forum Topic

Hello,In my project I've "revised baseline" Dated 31-05-2017 and "recovery schedule" Dated 20-01-2018, updates are applied on the recovery schedule. Now, I've few change orders that I need to study thier impact and decide the EOT the Contractor deser...

Apr 19, 2018

Logic driven by Early Dates

Forum Topic

Is there a setting to change to stop the logic being driven by the early dates? When I complete an activity the next activity then changes depending on what the early date is. Can this be changed? I need my plan to be driven by actual dates and not e...

Apr 19, 2018

Vivese Senso Duo– świetny prezent na szczęśliwa

Forum Topic

VIVÈSE SENSO DUO HAIR GROWTH OIL: TWOJA DROGA NA IMPONUJĄCE KOŁTUNY!Przypisujesz wątek spośród meszkami? Wylegają rzeczywiście niemało, że wydobywasz pałaszuje niby dokoła, a na latarni określasz niezwłocznie nieładne wentyle? Natomiast przypuszczaln...

Apr 22, 2018

Predecessors and Successors in same row of report in P6

Forum Topic

Hello guys, I am creating a new report in Primavera P6 (R 8.2) and the format I'm looking for is as below:Activity id             Activity name                 Predecessor name                         Successor name1                            Activi...

Apr 23, 2018

Recovery Schedule with Additional Manpower

Forum Topic

My client asked me to prepare a recovery schedule because we are in short negative -5% from the planned value.Now what my client want is that my recovery curve should cross/match the baseline curve as soon as possible & further more it must be up/ahe...

Apr 24, 2018

Visualizer layout error

Forum Topic

Hi! I am having a problem with Visualizer Layout.Pic 1) In schedule Comparison, I was comparing two projects, but those projects were no longer needed so I deleted it. After that, I wanted to compare other projects in the same layout(point-2 in pic),...

Apr 24, 2018

New Primavera EPS can't be created !!!

Forum Topic

I deleted the EPS in Primavera 15.1, where primavera accepted to delete all nodes, now I have no records in the EPS, it is completely empty.How can I create a new one if the add button (+) is not available and Primavera doesn't allow to add any new E...

Apr 26, 2018

metering skid fab and install/commission

Forum Topic

Anyone have a schedule for an oil metering skid from engineering, fab, transport install and commission?Interested in seeing the detailed activities that occur Thanks

Apr 27, 2018

Data distribution on the Gantt graph

Forum Topic

In the following figure I have some distributed data shown but I need to disclose which parameters on the leyend.  How it is done?

Apr 27, 2018

Integrated Project Delivery Approach

Forum Topic

In the IPA approach, if the owner assembles the project team without regard to any pre-existing relationships among team members, how can the owner successfully select a primary participant contractor? What are the best practices (tested) criterias o...

Apr 29, 2018

Planning /Programming Training?

Forum Topic

Hi all,First post on here and I am a QS so go easy on me! (Admin feel free to move this message if I have posted it in the wrong area). I'm a freelance QS and rather disillusioned with my career. I spent the first couple of years of my career working...

Apr 29, 2018

Earned value columns based on physical progress

Forum Topic

Hi, My activities' % Complete Type is set to "Physical".  I enter physical progress of the activities, however the earned values do not change. If i enter duration progress e.g remaining duraiton or labor hours, the earned value change.  My question ...

Mar 27, 2021

How to Use Traffic Light to Show Microsoft Project Progress Status

Blog

Sometimes in a Microsoft Project schedule, you might want a quick visual indicator of when a task is behind schedule or in progress and a good way to achieve this is through the use of a traffic light system. This tutorial will show you how to config...

Mar 30, 2021

Better Zoom Meetings

Blog

In one of my training classes, there is an exercise to conduct a daily stand-up meeting.  The meeting should be no longer than 15-minutes and be well structured.  In class, we challenge the leader with common distracting and unproductive behaviors.  ...

Apr 1, 2021

Strict link

Forum Topic

Hi Everyone,In my project i have some activities that can't be executed with delay, the second activity is modeled imediatly after first activity. For this reason I set "strict" on this activities.After scheduling, the report below show me this infor...

Apr 6, 2021

insurance liability question

Forum Topic

Question about insurance liability - this one is only tangently related to our usual schedule items. I am looking at the “value” at bid time of the owner moving from a cap on liability for the contractor comparing 100% of the contract price on liabil...

Apr 9, 2021