Primavera P6 EPPM R16.1 and Modeling Cure Time Lag
Forum TopicHere's how to use Primavera P6 EPPM R16.1 to model cure time lag http://ow.ly/2GeZ305M0Dc
Here's how to use Primavera P6 EPPM R16.1 to model cure time lag http://ow.ly/2GeZ305M0Dc
Hi planners,Can anyone share me any calculation sheet for the above matters..mail me : [email protected] help is greatly appreciatedtq
I'd like to create a schedule of dates that move with the programme for notification periods flagging when to submit documentation. Example would be a method statement that needs submitting 20 days before the planned date that work starts. As the the...
I am running P6 R 8.4 is there a way to change the settings default when a new project is created? I am looking to set the default of define critical activites as longest path instead of Total Float less than or equal to. I work with a variety of s...
Contractor to provide a critical path (as-built versus as-planned) schedule analysis for the Work assigned to Contractor which takes into account concurrent delays and the delays caused by Contractor.As a contractor we submitted Global Claim at end o...
Good Morning to All, Anybody can help me by providing the productivity rates of machineries which we were using in infrastructure projects. Thank you.
I want to make 3 different calanders for a project which needs to be 8hrs/5day working, 12 Hrs/6day working and 24hrs/7day working. In the "Time Periods" section of each calander what values i should use for Hours/Day, Hours/Week, Hours/Month and Hou...
Hi All,Recently my office laptop with 7.0 crashed and sent for repair, during this period I used my primavera 8.2. When I received my laptop I am not able to import the XER back to 7.0 with error message CVRJC-3324-A, related to some RISK. I checked...
Hi All,I was trying to modify the budgeted units, by exporting it to excel and import back the modified values. Resource and units are set for all activities.The issue is that in the exported excel file the sheet for resource assignment(TASKRSRC) is ...
This video shows how to display a Total Float bar in the Gantt Chart in Primavera P6 http://ow.ly/ueRY305Vsk0
Our PMC in the monthly presentation showed us this FORECASTED Delay by his trend curve.Can Anyone help and please tell me how he prepares the Delay Trend Curve ?[[wysiwyg_imageupload:4523:]]
"Please could you check that p6 is reporting the correct costs per period and update the November forecasts to £x"Incorrect costs are being reported against all periods, how can i change this? Do I need to go back to previous periods and put a negati...
The Impacted As-Planned method measures the impact of the delays on the as-planned schedule. The delays are formulated as activities and added to the as-planned schedule showing the effect of each delay and demonstrating how the project is being dela...
Previously, we have discussed how schedule pressure and various schedule compression techniques may manifest themselves unpredictably and with adverse effect on the project. When pondering this correlation it might be comforting to recall the age old...
Hi All, When I try to print a schedule to PDF it does not show the headers or footers in PDF, I can not figure out why this is happening? Any help would be greatly appreciated. Thank you,
Hi All, When I try to print a schedule to PDF it does not show the headers or footers in PDF, I can not figure out why this is happening? Any help would be greatly appreciated. Thank you,
Hi All, When I try to print a schedule to PDF it does not show the headers or footers in PDF, I can not figure out why this is happening? Any help would be greatly appreciated. Thank you,
Calling all UK PlannersI will soon be launching TEMPTASK Construction Planning which is a means of introducing Contractors who need planning tasks done to planners who can do it for them at a tendered fee.If you are a UK resident and a PowerProject u...
When I tried to import Excel file into Primavera P6 release 7, the last screen for importing (select the project from P6 you would like to import the Excel file to it) did not show any projects to be selected. I guess this could be happened due to l...
When I tried to import Excel file into Primavera P6 release 7, the last screen for importing (select the project from P6 you would like to import the Excel file to it) did not show any projects to be selected. I guess this could be happened due to l...